DOB filing B01417908-S4
Alteration filing at 760 Broadway
Building record · BIN 3048341
760 Broadway, Brooklyn, NY 11206
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 25 independently sourced records, including 19 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3048341
760 Broadway
Bedford-Stuyvesant (East), Brooklyn
A consolidated public-record view · updated Sep 1, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 9-story health facility built in 1972, on a 493,098 sq ft lot.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 4, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 7 open notices on record for this building, out of 255 notices on file; the most recent was issued Jun 12, 2026.
Issued Jun 12, 2026 — BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER PERMIT #B00916389-I1 ON 3/23/26 DUE TO CONTRACTOR WITHDRAWAL.
Issued Feb 22, 2024 — FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
Issued Jul 24, 2022 — STRUCTURE RENDERED NON COMPLIANT AT TIME OF INSPECTION DAMAGES OBSERVED TO HAVE BEEN SUSTAINED DUE TO MTA BUS IMPACTING SIDEWALK SHED DISPLACING FOUR SUPPORT POSTS
4 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3048341. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 25 alteration filing. Its latest status categories are 3 under review, 16 approved, 6 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 760 Broadway.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 25 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Remove and install mechanical equipment, ducts and piping to the 2nd floor. an exhaust riser will be installed in an existing shaft to the roof. no change to use, egress or occupancy. Filing B00226485-I1.
Remove and install plumbing piping and fixtures.remove and install piping for medical gas. no change to use, egress or occupancy. Filing B00226496-I1.
Remove, relocate and install new sprinkler heads and piping to the 2nd floor. no change to use, egress or occupancy. Filing B00226501-I1.
Filing B00226485-I1 reached an approved status.
Filing B00226496-I1 reached an approved status.
Filing B00226501-I1 reached an approved status.
Application file to replace plumbing pipe as per plan. no change in use, egress or occupancy under the application. Filing B00265098-I1.
Filing B00265098-I1 reached an approved status.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 per square feet. sidewalk shed shall comply with chapter # 33 of the 2014 code. no change in use occupancy or egress under this application. Filing B00324479-I1.
Filing B00324479-I1 reached an approved status.
DOB lists a first permit date for B00324479-I1. That is not by itself confirmation of activity on site.
New O2 piping for connection of the new bulk oxygen tank form to the existing hospital oxygen distribution system. New relocated emergency oxygen service connection connected to the existing hospital oxygen distribution system. Filing B00376706-I1.
Filing B00376706-I1 reached an approved status.
DOB lists a first permit date for B00376706-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00226485-I1. That is not by itself confirmation of activity on site.
Filing as per plans for the expansion of the existing oxygen and vacuum system on the 2nd. floor and 2nd. floor interstitial level at Woodhull Hospital. Filing B00420551-I1.
DOB lists a first permit date for B00420551-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00226496-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for B00376706-I1.
BHUnit, Dialysis, emergency, GI clinic, Intensive Care Surge, labor/delivery, Surgery PACU: Install UV lights or PCO to reduce virus particles & disinfect cooling coils; install or replace coils, replace existing humidifiers, convert filters to electroni. Filing B00457978-I1.
Filing B00457978-I1 reached an approved status.
Filing for temporary sidewalk shed on behalf of the owner. no change in use, occupancy or egress under this application. Filing B00476548-I1.
Filing for temporary sidewalk shed on behalf of the owner in conjunction with DOB bis job # 340725255. no change in use, occupancy or egress under this application. Filing B00479828-I1.
Filing B00479828-I1 reached an approved status.
DOB lists a first permit date for B00479828-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00226501-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00457978-I1. That is not by itself confirmation of activity on site.
BHUnit, Dialysis, emergency, GI clinic, Intensive Care Surge, labor/delivery, Surgery PACU: Install UV lights or PCO to reduce virus particles & disinfect cooling coils; install or replace coils, replace existing humidifiers, convert filters to electroni. Filing B00457978-P1.
Filing B00457978-P1 reached an approved status.
The latest status recorded for B00226485-I1 is “Permit Entire.”
The latest status recorded for B00226496-I1 is “Permit Entire.”
The latest status recorded for B00226501-I1 is “Permit Entire.”
The latest status recorded for B00265098-I1 is “Approved.”
The latest status recorded for B00324479-I1 is “Permit Entire.”
The latest status recorded for B00376706-I1 is “LOC Issued.”
The latest status recorded for B00420551-I1 is “Permit Entire.”
The latest status recorded for B00457978-P1 is “Approved.”
The latest status recorded for B00476548-I1 is “Objections.”
Roof replacement. Filing B00618033-I1.
Replacement of guardrails, adjusting bulkhead doors opening, new steps and structural steel posts for support of future solar panels as shown on drawings filed herewith no change in use, egress or occupancy. Filing B00618401-I1.
Replacement of roof, roof drains, guardrails, bulkhead doors and frames. Filing B00618379-I1.
Filing B00618379-I1 reached an approved status.
Filing B00618033-I1 reached an approved status.
Filing B00618401-I1 reached an approved status.
Full roof membrane replacement at the 3rd floor roof (auditorium) roof and interior open vent stack. Filing B00643266-I1.
Filing B00643266-I1 reached an approved status.
The latest status recorded for B00457978-I1 is “Permit Entire.”
1.replacemnt of chilled water coils for two ahu. 2.addition of steam humidifiers, ultra violet lights and bi polar ionization to 15 ahu. Filing B00457978-P2.
Replacement of guardrails, adjusting bulkhead doors opening, new steps and structural steel posts for support of future solar panels as shown on drawings filed herewith no change in use, egress or occupancy. Filing B00618401-P1.
DOB lists a first permit date for B00618033-I1. That is not by itself confirmation of activity on site.
Filing B00618401-P1 reached an approved status.
The latest status recorded for B00618401-P1 is “Approved.”
DOB lists a first permit date for B00618379-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00618401-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B00457978-P2 is “Objections.”
DOB lists a first permit date for B00643266-I1. That is not by itself confirmation of activity on site.
Full roof membrane replacement at the 3rd floor roof (auditorium) roof and interior open vent stack. Filing B00643266-P1.
Filing B00643266-P1 reached an approved status.
The latest status recorded for B00643266-P1 is “Approved.”
Roof replacement. Filing B00618033-P2.
Filing B00618033-P2 reached an approved status.
The latest status recorded for B00618033-P2 is “Approved.”
Replacement of guardrails, adjusting bulkhead doors opening, new steps and structural steel posts for support of future solar panels as shown on drawings filed herewith no change in use, egress or occupancy. Filing B00618401-P2.
Filing B00618401-P2 reached an approved status.
The latest status recorded for B00618401-P2 is “Approved.”
DOB recorded a sign-off for B00643266-I1.
The latest status recorded for B00643266-I1 is “LOC Issued.”
DOB recorded a sign-off for B00618033-I1.
The latest status recorded for B00618033-I1 is “LOC Issued.”
DOB recorded a sign-off for B00618401-I1.
DOB recorded a sign-off for B00618379-I1.
The latest status recorded for B00618379-I1 is “LOC Issued.”
The latest status recorded for B00618401-I1 is “LOC Issued.”
DOB recorded a sign-off for B00479828-I1.
The latest status recorded for B00479828-I1 is “LOC Issued.”
Herewith filing for civil sitework in conjunction with exterior sallyport/vertical transport per plans. filed in conjunction w/ alt co b01315330 & alt 2 b01424867. no change in use, occupancy or egress under this application. Filing B01417908-I1.
Herewith filing for new 27.5' curb cut per plans. Filing B01417908-S2.
Herewith filing for plumbing civil work per plans. Filing B01417908-S1.
Herewith filing for new 24.00' curb cut per plans. Filing B01417908-S3.
Herewith filing builders pavement plan in conjunction with alt co b01315330. Filing B01417908-S4.
Filing B01417908-I1 reached an approved status.
The latest status recorded for B01417908-I1 is “Approved.”
Filing B01417908-S2 reached an approved status.
The latest status recorded for B01417908-S2 is “Approved.”
Filing B01417908-S1 reached an approved status.
The latest status recorded for B01417908-S1 is “Approved.”
Filing B01417908-S3 reached an approved status.
The latest status recorded for B01417908-S3 is “Approved.”
The latest status recorded for B01417908-S4 is “Objections.”