What the filing says
A public-record reading of the proposed work.
BHUnit, Dialysis, emergency, GI clinic, Intensive Care Surge, labor/delivery, Surgery PACU: Install UV lights or PCO to reduce virus particles & disinfect cooling coils; install or replace coils, replace existing humidifiers, convert filters to electroni
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 9-story health facility built in 1972, on a 493,098 sq ft lot.
- Built
- 1972
- Last altered
- 2004
- Floors
- 9
- Residential units
- 0
- Building type
- Health facility
- Land use
- Public facilities and institutions
- Zoning district
- R6
- Lot area
- 493,098 sq ft
- Building area
- 835,231 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 4, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 7 open notices on record for this building, out of 255 notices on file; the most recent was issued Jun 12, 2026.
- Construction
Issued Jun 12, 2026 — BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER PERMIT #B00916389-I1 ON 3/23/26 DUE TO CONTRACTOR WITHDRAWAL.
- No report and / or late filing (facade)
Issued Feb 22, 2024 — FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
- Construction
Issued Jul 24, 2022 — STRUCTURE RENDERED NON COMPLIANT AT TIME OF INSPECTION DAMAGES OBSERVED TO HAVE BEEN SUSTAINED DUE TO MTA BUS IMPACTING SIDEWALK SHED DISPLACING FOUR SUPPORT POSTS
4 further open notices are on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 4, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00457978-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00457978-I1
- BBL
- 3017230001
- Postal code
- 11206 · 2249 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0