DOB filing B00358580-I1
Alteration filing at 815 Broadway
Building record · BIN 3071688
815 Broadway, Brooklyn, NY 11206
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 21 independently sourced records, including 14 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3071688
815 Broadway
Bushwick (West), Brooklyn
A consolidated public-record view · updated Mar 9, 2022
A building-level summary of matched filings, active-status records and published identifiers.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3071688. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 21 alteration filing. Its latest status categories are 7 recorded as completed, 14 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 815 Broadway.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 21 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Installation of temporary construction fence per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application. Filing B00050240-I1.
DOB lists a first permit date for B00050240-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for B00050240-I1.
Mechanical systems work for new long-term coronavirus medical facility including new roof-top units (RTUs), unit heaters (CUHs), exhaust fans (EFs), HVAC ductwork, smoke purge systems, fuel oil connections to roof mounted generator & DX hot water units. Filing B00348071-I1.
Filing B00348071-I1 reached an approved status.
Installation of new water lines, waste lines, vent lines and piping with plumbing fixtures for new plumbing installation and installation of new sprinkler piping and heads for modification to the existing system on Floors, Cellar, 001, 002-005. Filing B00348076-I1.
INSTALLATION OF A EMERGENCY GENERATOR on roof associated fuel oil storage and piping to be filed separately. Filing B00354296-I1.
Installation of new Medical Gas system including oxygen and vacuum with associated piping from cellar to 5th and roof. Filing B00353915-I1.
INSTALLATION OF A fuel oil storage tank in the cellar and fuel oil piping from cellar to 5th floor and roof. Filing B00354316-I1.
Filing B00348076-I1 reached an approved status.
Installation of plywood fence as per drawings. plywood fence shall comply with chapter #33 of the NYC building code. no change in use, occupancy or egress under this application. Filing B00358580-I1.
DOB lists a first permit date for B00358580-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00348076-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00348071-I1. That is not by itself confirmation of activity on site.
Filing B00353915-I1 reached an approved status.
Filing B00354316-I1 reached an approved status.
Mechanical systems work for new long-term coronavirus medical facility including new roof-top units (RTUs), unit heaters (CUHs), exhaust fans (EFs), HVAC ductwork, smoke purge systems, fuel oil connections to roof mounted generator & DX hot water units. Filing B00348071-P1.
Filing B00354296-I1 reached an approved status.
Filing B00348071-P1 reached an approved status.
DOB lists a first permit date for B00353915-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00354316-I1. That is not by itself confirmation of activity on site.
Mechanical systems work for new long-term coronavirus medical facility including new roof-top units (RTUs), unit heaters (CUHs), exhaust fans (EFs), HVAC ductwork, smoke purge systems, fuel oil connections to roof mounted generator & DX hot water units. Filing B00348071-P2.
Filing B00348071-P2 reached an approved status.
Installation of new water lines, waste lines, vent lines and piping with plumbing fixtures for new plumbing installation and installation of new sprinkler piping and heads for modification to the existing system on Floors, Cellar, 001, 002-005. Filing B00348076-P1.
Filing B00348076-P1 reached an approved status.
Installation of new Medical Gas system including oxygen and vacuum with associated piping from cellar to 5th and roof. Filing B00353915-P1.
Filing B00353915-P1 reached an approved status.
Mechanical systems work for new long-term coronavirus medical facility including new roof-top units (RTUs), unit heaters (CUHs), exhaust fans (EFs), HVAC ductwork, smoke purge systems, fuel oil connections to roof mounted generator & DX hot water units. Filing B00348071-P3.
Filing B00348071-P3 reached an approved status.
The latest status recorded for B00348071-P1 is “Approved.”
The latest status recorded for B00348071-P2 is “Approved.”
The latest status recorded for B00348071-P3 is “Approved.”
The latest status recorded for B00348076-P1 is “Approved.”
The latest status recorded for B00353915-P1 is “Approved.”
The latest status recorded for B00050240-I1 is “LOC Issued.”
Installation of new water lines, waste lines, vent lines and piping with plumbing fixtures for new plumbing installation and installation of new sprinkler piping and heads for modification to the existing system on Floors, Cellar, 001, 002-005. Filing B00348076-P2.
Installation of new Medical Gas system including oxygen and vacuum with associated piping from cellar to 5th and roof. Filing B00353915-P2.
Filing B00348076-P2 reached an approved status.
The latest status recorded for B00348076-P2 is “Approved.”
Filing B00353915-P2 reached an approved status.
The latest status recorded for B00353915-P2 is “Approved.”
INSTALLATION OF A EMERGENCY GENERATOR on roof associated fuel oil storage and piping to be filed separately. Filing B00354296-P1.
Installation of new Medical Gas system including oxygen and vacuum with associated piping from cellar to 5th and roof. Filing B00353915-P3.
Filing B00353915-P3 reached an approved status.
The latest status recorded for B00353915-P3 is “Approved.”
Filing B00354296-P1 reached an approved status.
The latest status recorded for B00354296-P1 is “Approved.”
Installation of new water lines, waste lines, vent lines and piping with plumbing fixtures for new plumbing installation and installation of new sprinkler piping and heads for modification to the existing system on Floors, Cellar, 001, 002-005. Filing B00348076-P3.
DOB recorded a sign-off for B00354316-I1.
The latest status recorded for B00354316-I1 is “LOC Issued.”
Filing B00348076-P3 reached an approved status.
The latest status recorded for B00348076-P3 is “Approved.”
DOB lists a first permit date for B00354296-I1. That is not by itself confirmation of activity on site.
Installation of new Medical Gas system including oxygen and vacuum with associated piping from cellar to 5th and roof. Filing B00353915-P4.
Installation of new water lines, waste lines, vent lines and piping with plumbing fixtures for new plumbing installation and installation of new sprinkler piping and heads for modification to the existing system on Floors, Cellar, 001, 002-005. Filing B00348076-P5.
Filing B00348076-P5 reached an approved status.
The latest status recorded for B00348076-P5 is “Approved.”
Filing B00353915-P4 reached an approved status.
The latest status recorded for B00353915-P4 is “Approved.”
DOB recorded a sign-off for B00353915-I1.
The latest status recorded for B00353915-I1 is “LOC Issued.”
Installation of new water lines, waste lines, vent lines and piping with plumbing fixtures for new plumbing installation and installation of new sprinkler piping and heads for modification to the existing system on Floors, Cellar, 001, 002-005. Filing B00348076-P6.
Filing B00348076-P6 reached an approved status.
The latest status recorded for B00348076-P6 is “Approved.”
Installation of new water lines, waste lines, vent lines and piping with plumbing fixtures for new plumbing installation and installation of new sprinkler piping and heads for modification to the existing system on Floors, Cellar, 001, 002-005. Filing B00348076-P7.
Filing B00348076-P7 reached an approved status.
The latest status recorded for B00348076-P7 is “Approved.”
DOB recorded a sign-off for B00354296-I1.
The latest status recorded for B00354296-I1 is “LOC Issued.”
DOB recorded a sign-off for B00348076-I1.
The latest status recorded for B00348076-I1 is “LOC Issued.”
DOB recorded a sign-off for B00348071-I1.
The latest status recorded for B00348071-I1 is “LOC Issued.”
DOB recorded a sign-off for B00358580-I1.
The latest status recorded for B00358580-I1 is “LOC Issued.”