NYC DOB record · B00348071-I1

815 Broadway

815 Broadway, Brooklyn, NY 11206

Alteration filing in Bushwick (West), Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 12, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00348071-I1

815 Broadway

Brooklyn, NY 11206

Alteration filing · status dated Jun 30, 2021

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00348071-I1 as a alteration filing at 815 Broadway, Brooklyn, NY 11206. Its latest published status category is Recorded as completed, dated Jun 30, 2021. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Jun 30, 2021
Proposed scale
Not stated in this filing
The building, not the filingEvery filing at BIN 3071688, with the parcel and violation recordApplicant of recordSee the 57 filings that name Jacob Feinberg Katz & Michaeli Cons
FiledMay 15, 2020
Current recordRecorded as completed
Proposed scaleNot specified
Recorded cost$6.4M

What the filing says

A public-record reading of the proposed work.

Mechanical systems work for new long-term coronavirus medical facility including new roof-top units (RTUs), unit heaters (CUHs), exhaust fans (EFs), HVAC ductwork, smoke purge systems, fuel oil connections to roof mounted generator & DX hot water units.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 5-story office building built in 1926, with 16 homes, on a 8,580 sq ft lot.

Built
1926
Last altered
2016
Floors
5
Residential units
16
Building type
Office building
Land use
Commercial and office
Zoning district
C4-3
Lot area
8,580 sq ft
Building area
49,500 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 7 open notices on record for this building, out of 54 notices on file; the most recent was issued Jun 20, 2023.

  • Low pressure boiler

    Issued Jun 20, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION

  • Elevator

    Issued Nov 9, 2021

  • Elevator

    Issued Nov 9, 2021

  • 4 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00348071-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00348071-I1
BBL
3031320001
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
0
Proposed dwelling units
0
mechanical