DOB filing B01394361-I1
Alteration filing at 280 89 Street
Building record · BIN 3154131
280 89 Street, Brooklyn, NY 11209
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 2 independently sourced records, including 0 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3154131
280 89 Street
Bay Ridge, Brooklyn
A consolidated public-record view · updated Sep 30, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 2-story mainly residential with some commercial built in 1923, on a 1,800 sq ft lot.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 2, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 2 open notices on record for this building, out of 6 notices on file; the most recent was issued Apr 28, 2026.
Issued Apr 28, 2026 — INSTALL APPROXIMATELY 90 LINEAR FEET OF SIDEWALK SHED AT EXPOSURE #1 (89TH STREET) AND APPROXIMATELY 20 LINEAR FEET ALONG EXPOSURE #2 (3 AVENUE) TO SAFEGUARD THE PUBLIC
Issued Apr 27, 2026 — STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION OBSERVED HORIZONTAL CRACK WITH SEPARATION EXPOSING STEEL LINTEL WITH DETERIORATION ABOVE 1ST FL. WINDOW. PARAPET WITH STEP CRACKS AT MULTIPLE LOCATIONS ALONG WITH MISSING MORTAR AT JOINTS. PARAPET SIGNS OF LEANING/BULGING. POTENTIAL OF DETACHMENT/COLLAPSE.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 2, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3154131. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 2 alteration filing. Its latest status categories are 2 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 280 89 Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 2 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
28-105.4.1 Emergency Work- Installation of sidewalk shed as directed by Brooklyn Boro Commissioner IED20211 to protect public from falling debris. No change in use, egress or occupacny. we shall comply with chapter 33 of 2022 B.C. Filing B01394361-I1.
DOB lists a first permit date for B01394361-I1. That is not by itself confirmation of activity on site.
Maintenance and repair of existing brick facade including parapet. Associated scaffold filing: B01394361-I1-SH. Filing B01417623-I1.
Filing B01417623-I1 reached an approved status.
DOB lists a first permit date for B01417623-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for B01417623-I1.
The latest status recorded for B01417623-I1 is “LOC Issued.”
DOB recorded a sign-off for B01394361-I1.
The latest status recorded for B01394361-I1 is “LOC Issued.”