What the filing says
A public-record reading of the proposed work.
28-105.4.1 Emergency Work- Installation of sidewalk shed as directed by Brooklyn Boro Commissioner IED20211 to protect public from falling debris. No change in use, egress or occupacny. we shall comply with chapter 33 of 2022 B.C
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2-story mainly residential with some commercial built in 1923, on a 1,800 sq ft lot.
- Built
- 1923
- Floors
- 2
- Residential units
- 2
- Building type
- Mainly residential with some commercial
- Land use
- Mixed residential and commercial
- Zoning district
- R6B
- Lot area
- 1,800 sq ft
- Building area
- 3,600 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 2, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 6 notices on file; the most recent was issued Apr 28, 2026.
- Immediate
Issued Apr 28, 2026 — INSTALL APPROXIMATELY 90 LINEAR FEET OF SIDEWALK SHED AT EXPOSURE #1 (89TH STREET) AND APPROXIMATELY 20 LINEAR FEET ALONG EXPOSURE #2 (3 AVENUE) TO SAFEGUARD THE PUBLIC
- Construction
Issued Apr 27, 2026 — STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION OBSERVED HORIZONTAL CRACK WITH SEPARATION EXPOSING STEEL LINTEL WITH DETERIORATION ABOVE 1ST FL. WINDOW. PARAPET WITH STEP CRACKS AT MULTIPLE LOCATIONS ALONG WITH MISSING MORTAR AT JOINTS. PARAPET SIGNS OF LEANING/BULGING. POTENTIAL OF DETACHMENT/COLLAPSE.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 2, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01394361-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded04
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01394361-I1
- BBL
- 3060630038
- Postal code
- 11209 · 1850 filings
- Review type
- Professional Certification
- Existing stories
- 2
- Proposed stories
- 2
- Existing dwelling units
- 2
- Proposed dwelling units
- 2








