Building record · BIN 3326947

109 Christopher Avenue

109 Christopher Avenue, Brooklyn, NY 11212

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 3 independently sourced records, including 3 that are not recorded as completed, closed or withdrawn.

Open full map
109 Christopher Avenue building dossier graphic showing matched DOB filings and current record counts
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings3
Open or active-status records3
First included filingNov 1, 2019
Latest recorded changeAug 31, 2026

The lot

What is already here?

The lot holds a 24-story elevator apartment building built in 1967, with 414 homes, on a 156,000 sq ft lot.

Built
1967
Floors
24
Residential units
414
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R6
Lot area
156,000 sq ft
Building area
418,000 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 3, 2026. They describe the tax lot, not any single filing.

Violation record

Are there open violations here?

The Department of Buildings has 4 open notices on record for this building, out of 19 notices on file; the most recent was issued Jun 2, 2025.

  • Construction

    Issued Jun 2, 2025 — EMERGENCY WORK ORDER:OBSERVED EP1(W ELE)DAMAGED/CRACKED CONCRETE AWNIN EXP 2 (N ELEV) BROKEN WINDOW AROUND 3FL DETERIORATED WINDOW LINTELS EXP3 (E ELEV) DAMAGED WINDOW LINTELS. REMEDY: IMMEDIATELY PROVIDE ADEQUATE SAFETY MEASURES TO SECURE THE PUBLIC SAFETY AROUND THE ENTIRE PERIMETER BLDG,CONCRETE STRUCT EXP1 U/DIRECTION OF LICENSED PROFESSION

  • Construction

    Issued Jun 2, 2025 — FAILURE TO MAINTAIN BLDG FACADE IN CODE COMPLIANT MANNER. EXP1 (W ELEV CONCRETE AWNING CRACKED & WITH MISSING/DAMAGED MORTAR JOINTS. EXPS 2 & 3 (N & E ELEV) DAMAGED WINDOW LINTELS. AT EXP 2 (NORTH ELEV) BROKEN WINDOW ON THE 2FL WAS OBSERVED. REMEDY: REPAIR AND/OR REPLACE

  • No report and / or late filing (facade)

    Issued Feb 22, 2022 — FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022

  • 1 further open notice is on file. Open the source dataset for the full list.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 2, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3326947. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 3 alteration filing. Its latest status categories are 1 under review, 2 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Nov 1, 2019
Latest recorded change
Aug 31, 2026
Highest proposed story count
18 stories
Highest proposed unit count
414 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 109 Christopher Avenue.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 3 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Installation of new sidewalk shed at 109 christopher avenue, brooklyn as indicated on plans. there will be no change in the use, egress, or occupancy under this application. Filing B00257046-I1.

    01
  2. Alteration filed

    Installation of temporary construction fence at 109 christopher avenue, brooklyn as indicated on plans. there will be no change in the use, egress, or occupancy under this application. Filing B00257032-I1.

    02
  3. Permit recorded for alteration

    DOB lists a first permit date for B00257046-I1. That is not by itself confirmation of activity on site.

    03
  4. Permit recorded for alteration

    DOB lists a first permit date for B00257032-I1. That is not by itself confirmation of activity on site.

    04
  5. Alteration now approved

    The latest status recorded for B00257046-I1 is “Permit Entire.”

    05
  6. Alteration now approved

    The latest status recorded for B00257032-I1 is “Permit Entire.”

    06
  7. Alteration filed

    Facade restoration at Glenmore Plaza# 4 to comply with LL 11/98, Cycle 9 report. No change in use, egress, or occupancy. Filing B01167242-P2.

    07
  8. Alteration now under review

    The latest status recorded for B01167242-P2 is “Plan Examiner Review.”

    08