What the filing says
A public-record reading of the proposed work.
Installation of temporary construction fence at 109 christopher avenue, brooklyn as indicated on plans. there will be no change in the use, egress, or occupancy under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 24-story elevator apartment building built in 1967, with 414 homes, on a 156,000 sq ft lot.
- Built
- 1967
- Floors
- 24
- Residential units
- 414
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R6
- Lot area
- 156,000 sq ft
- Building area
- 418,000 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 17, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 19 notices on file; the most recent was issued Jun 2, 2025.
- Construction
Issued Jun 2, 2025 — FAILURE TO MAINTAIN BLDG FACADE IN CODE COMPLIANT MANNER. EXP1 (W ELEV CONCRETE AWNING CRACKED & WITH MISSING/DAMAGED MORTAR JOINTS. EXPS 2 & 3 (N & E ELEV) DAMAGED WINDOW LINTELS. AT EXP 2 (NORTH ELEV) BROKEN WINDOW ON THE 2FL WAS OBSERVED. REMEDY: REPAIR AND/OR REPLACE
- Construction
Issued Jun 2, 2025 — EMERGENCY WORK ORDER:OBSERVED EP1(W ELE)DAMAGED/CRACKED CONCRETE AWNIN EXP 2 (N ELEV) BROKEN WINDOW AROUND 3FL DETERIORATED WINDOW LINTELS EXP3 (E ELEV) DAMAGED WINDOW LINTELS. REMEDY: IMMEDIATELY PROVIDE ADEQUATE SAFETY MEASURES TO SECURE THE PUBLIC SAFETY AROUND THE ENTIRE PERIMETER BLDG,CONCRETE STRUCT EXP1 U/DIRECTION OF LICENSED PROFESSION
- No report and / or late filing (facade)
Issued Feb 22, 2022 — FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
1 further open notice is on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00257032-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 70,325 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00257032-I1
- BBL
- 3037090001
- Postal code
- 11212 · 2159 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 414
- Proposed dwelling units
- 414