DOB filing B00195298-I1
Alteration filing at 8 Grand Avenue
Building record · BIN 3398454
8 Grand Avenue, Brooklyn, NY 11205
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 6 independently sourced records, including 4 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3398454
8 Grand Avenue
Fort Greene, Brooklyn
A consolidated public-record view · updated Mar 7, 2025
A building-level summary of matched filings, active-status records and published identifiers.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3398454. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 6 alteration filing. Its latest status categories are 4 approved, 2 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 8 Grand Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 6 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Replacing roof drains and installation of storm risers on floors 1st thru 7th and roof. no change in occupancy use and egress. Filing B00213613-I1.
Filing B00213613-I1 reached an approved status.
Installation of a heavy duty sidewalk shed as per plans during general construction work. no change in use, egress or occupancy. sidewalk shed to comply with chapter 33 of building code of 2014. Filing B00231091-I1.
Installation of a temporary scaffold as per plans during general construction work. no change in use, egress or occupancy. scaffold to comply with chapter 33 of NYC building code of 2014. Filing B00231132-I1.
DOB lists a first permit date for B00231091-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00231132-I1. That is not by itself confirmation of activity on site.
Filing for installation of new class I standpipe system and modification of existing building sprinklers in conjunction with ALT-1 application 321593067.No change to use, egress or occupancy under this application. Filing B00195298-I1.
DOB lists a first permit date for B00213613-I1. That is not by itself confirmation of activity on site.
Replacing roof drains and installation of storm risers on floors 1st thru 7th and roof. no change in occupancy use and egress. Filing B00213613-P1.
Filing B00213613-P1 reached an approved status.
The latest status recorded for B00213613-P1 is “Approved.”
The latest status recorded for B00231132-I1 is “Permit Entire.”
DOB recorded a sign-off for B00213613-I1.
The latest status recorded for B00213613-I1 is “LOC Issued.”
Filing B00195298-I1 reached an approved status.
DOB lists a first permit date for B00195298-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for B00231091-I1.
The latest status recorded for B00231091-I1 is “LOC Issued.”
Filing for installation of new class I standpipe system and modification of existing building sprinklers in conjunction with ALT-1 application 321593067.No change to use, egress or occupancy under this application. Filing B00195298-P1.
The latest status recorded for B00195298-I1 is “Permit Entire.”
Filing B00195298-P1 reached an approved status.
The latest status recorded for B00195298-P1 is “Approved.”