What the filing says
A public-record reading of the proposed work.
Replacing roof drains and installation of storm risers on floors 1st thru 7th and roof. no change in occupancy use and egress
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 7-story elevator apartment building built in 1994, with 40 homes, on a 16,775 sq ft lot.
- Built
- 1994
- Last altered
- 2023
- Floors
- 7
- Residential units
- 40
- Building type
- Elevator apartment building
- Land use
- Mixed residential and commercial
- Zoning district
- M1-2
- Lot area
- 16,775 sq ft
- Building area
- 85,000 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 5 open notices on record for this building, out of 111 notices on file; the most recent was issued Mar 22, 2022.
- Construction
Issued Mar 22, 2022 — FTM EXTERIOR BUILDING FACADE AND APPURTENANCES. BLDG FAILED TO MAKE NECESSARY REPAIRS ON BLDG EXTERIOR FACADE. EXPOSURES 3 & 4 HAVE DAMAGED CONCRETE & BRICKWALL THROUGHOUT FACADE. EXPOSED REBAR DAMAGED LINTELS & SILLS, SPALLED BRICK & CONCRETE, DAMAGED WINDOWS MISSING MISSING METAL AROUND WINDOWS. REMEDY:MAINTAIN BLDG FACADE
- Construction
Issued Sep 2, 2021 — FTM EXTERIOR BLDG FACADE AND APPURTENANCES. OBSERVED DEFECTIVE FACADE AT EXP 4(NORTH), CRACKS AT PARAPET WALL, MISSING/SPALLED STUCCO, EXPOSING REBARS, DAMAGED WINDOW FRAME, ERODE/RUSTY. REMEDY: MAINTAIN EXTERIOR BLDG FACADE AND APPIRTENANCES. PROVDE SAFETY MEASURES AND REPAIR DAMAGED FACADE AS PER 1 RCNY 103-04
- Construction
Issued Aug 13, 2021 — FAILURE TO COMPLY WITH COMMISSIONER'S ORDER AC-28-201.1. BUILDING OWNER-FAILURE TO COMPLY WITH COMMISSIONER'S ORDER 092719CLL0206PR ISSUED ON 09/27/2019. AS OF 08/13/2021 OWNER HAS NOT COMPLIED WITH IMMEDIATE CURE ORDER. REMEDY: IMMED COMPLY WITH CODE AND COMMISSIONER'S ORDERS
2 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00213613-P1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00213613-P1
- BBL
- 3018770027
- Postal code
- 11205 · 2345 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 42
- Proposed dwelling units
- 42