DOB filing B00579218-I1
New building at 605 Lorimer Street
Building record · BIN 3427426
605 Lorimer Street, Brooklyn, NY 11211
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 25 independently sourced records, including 17 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3427426
605 Lorimer Street
East Williamsburg, Brooklyn
A consolidated public-record view · updated Jul 17, 2024
A building-level summary of matched filings, active-status records and published identifiers.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3427426. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 25 new building. Its latest status categories are 7 recorded as completed, 17 approved, 1 closed or withdrawn. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 605 Lorimer Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 25 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Proposed 4 Story building with Penthouse. Filing B00579218-I1.
Installation of Plumbing and Sprinkler Fixture. Filing B00579218-S1.
Installation of Mechanical System. Filing B00579218-S2.
Application is filed for installation of 8' high temporary construction fence. Filing B00579218-S6.
Filing B00579218-S6 reached an approved status.
Construction of underpinning underneath existing neighbor's foundation wall/footing; shoring the construction site at front and rear side walls with soldier piles and timber laggings; bench and slop-cut excavation from interior to rear yard. Filing B00579218-S4.
Construction new 4-story structure with reinforced CMU walls and reinforced concrete slab on deck over steel beams. Filing B00579218-S5.
Construction of new foundation walls, wall footings, grade beams, and slab on grade. Filing B00579218-S3.
Filing B00579218-I1 reached an approved status.
Filing B00579218-S5 reached an approved status.
Filing B00579218-S4 reached an approved status.
Filing B00579218-S3 reached an approved status.
Proposed 4 Story building with Penthouse. Filing B00579218-P1.
DOB lists a first permit date for B00579218-S4. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00579218-S3. That is not by itself confirmation of activity on site.
Filing B00579218-S1 reached an approved status.
Installation of Plumbing and Sprinkler Fixture. Filing B00579218-P2.
Filing B00579218-S2 reached an approved status.
Construction of new foundation walls, wall footings, grade beams, and slab on grade. Filing B00579218-P4.
Construction of underpinning underneath existing neighbor's foundation wall/footing; shoring the construction site at front and rear side walls with soldier piles and timber laggings; bench and slop-cut excavation from interior to rear yard. Filing B00579218-P3.
Filing B00579218-P3 reached an approved status.
Filing B00579218-P2 reached an approved status.
DOB lists a first permit date for B00579218-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00579218-S1. That is not by itself confirmation of activity on site.
Filing B00579218-P1 reached an approved status.
The latest status recorded for B00579218-P1 is “Approved.”
Installation of Plumbing and Sprinkler Fixture. Filing B00579218-P5.
DOB lists a first permit date for B00579218-S5. That is not by itself confirmation of activity on site.
Construction new 4-story structure with reinforced CMU walls and reinforced concrete slab on deck over steel beams. Filing B00579218-P7.
Filing B00579218-P5 reached an approved status.
Filing B00579218-P7 reached an approved status.
Construction new 4-story structure with reinforced CMU walls and reinforced concrete slab on deck over steel beams. Filing B00579218-P8.
Filing B00579218-P8 reached an approved status.
Proposed 4 Story building with Penthouse. Filing B00579218-A1.
Construction new 4-story structure with reinforced CMU walls and reinforced concrete slab on deck over steel beams. Filing B00579218-A2.
Filing B00579218-A2 reached an approved status.
Installation of Plumbing and Sprinkler Fixture. Filing B00579218-A3.
DOB lists a first permit date for B00579218-S6. That is not by itself confirmation of activity on site.
Filing B00579218-A3 reached an approved status.
Installation of Plumbing and Sprinkler Fixture. Filing B00579218-A4.
Filing B00579218-A4 reached an approved status.
Installation of Mechanical System. Filing B00579218-A5.
Filing B00579218-A5 reached an approved status.
Filing B00579218-A1 reached an approved status.
The latest status recorded for B00579218-A1 is “Approved.”
The latest status recorded for B00579218-A2 is “Approved.”
The latest status recorded for B00579218-A3 is “Approved.”
The latest status recorded for B00579218-A4 is “Approved.”
The latest status recorded for B00579218-A5 is “Approved.”
The latest status recorded for B00579218-P2 is “Approved.”
The latest status recorded for B00579218-P3 is “Approved.”
The latest status recorded for B00579218-P5 is “Approved.”
The latest status recorded for B00579218-P7 is “Approved.”
The latest status recorded for B00579218-P8 is “Approved.”
The latest status recorded for B00579218-P4 is “Filing Withdrawn.”
DOB recorded a sign-off for B00579218-S3.
The latest status recorded for B00579218-S3 is “LOC Issued.”
DOB recorded a sign-off for B00579218-S5.
The latest status recorded for B00579218-S5 is “LOC Issued.”
Installation of Plumbing and Sprinkler Fixture. Filing B00579218-A6.
Installation of Mechanical System. Filing B00579218-A7.
Filing B00579218-A7 reached an approved status.
The latest status recorded for B00579218-A7 is “Approved.”
DOB lists a first permit date for B00579218-S2. That is not by itself confirmation of activity on site.
Filing B00579218-A6 reached an approved status.
The latest status recorded for B00579218-A6 is “Approved.”
Installation of Plumbing and Sprinkler Fixture. Filing B00579218-A8.
Filing B00579218-A8 reached an approved status.
The latest status recorded for B00579218-A8 is “Approved.”
DOB recorded a sign-off for B00579218-S4.
DOB recorded a sign-off for B00579218-S2.
The latest status recorded for B00579218-S2 is “LOC Issued.”
The latest status recorded for B00579218-S4 is “LOC Issued.”
DOB recorded a sign-off for B00579218-S6.
The latest status recorded for B00579218-S6 is “LOC Issued.”
Proposed 4 Story building with Penthouse. Filing B00579218-A9.
Filing B00579218-A9 reached an approved status.
The latest status recorded for B00579218-A9 is “Approved.”
Installation of Plumbing and Sprinkler Fixture. Filing B00579218-B1.
Filing B00579218-B1 reached an approved status.
The latest status recorded for B00579218-B1 is “Approved.”
DOB recorded a sign-off for B00579218-S1.
The latest status recorded for B00579218-S1 is “LOC Issued.”
Proposed 4 Story building with Penthouse. Filing B00579218-B2.
Filing B00579218-B2 reached an approved status.
The latest status recorded for B00579218-B2 is “Approved.”
The latest status recorded for B00579218-I1 is “CO Issued.”