NYC DOB record · B00579218-P7

605 Lorimer Street

605 Lorimer Street, Brooklyn, NY 11211

New building filing in East Williamsburg, Brooklyn. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedNew building

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00579218-P7

605 Lorimer Street

Brooklyn, NY 11211

New building · status dated Sep 1, 2023

Current record
Approved
Proposed scale
4 stories
Dwelling units
7
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00579218-P7 as a new building at 605 Lorimer Street, Brooklyn, NY 11211. Its latest published status category is Approved, dated Sep 1, 2023. The filing records 4 proposed stories and 7 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Approved
Latest status date
Sep 1, 2023
Proposed scale
4 proposed stories and 7 proposed dwelling units
The building, not the filingwhat it sold for, apartment sizes, the owner of record and every filing at BIN 3427426Applicant of recordSee the 23 filings that name Simon Jiang
FiledOct 11, 2022
Current recordApproved
Proposed scale4 stories
Recorded cost$500,000

What the filing says

A public-record reading of the proposed work.

Construction new 4-story structure with reinforced CMU walls and reinforced concrete slab on deck over steel beams.

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00579218-P7.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00579218-P7
BBL
3027510031
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
4
Existing dwelling units
Empty in the source
Proposed dwelling units
7
Structural work