DOB filing B00593338-I1
New building at 380 Fourth Avenue
Building record · BIN 3429554
380 Fourth Avenue, Brooklyn, NY 11215
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 25 independently sourced records, including 16 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3429554
380 Fourth Avenue
Carroll Gardens-Cobble Hill-Gowanus-Red Hook, Brooklyn
A consolidated public-record view · updated Sep 8, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 17-story elevator apartment building built in 2024, with 197 homes, on a 20,000 sq ft lot.
Housing violations
2 violations are open against this address under the Housing Maintenance Code.
Open means the Department of Housing Preservation and Development has not recorded it as corrected, which is not the same as nobody having fixed it. The city publishes the apartment each was written against; that is not carried here, because a count says a building has a problem and an apartment number says whose.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 21, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
No open violations are recorded for this building. 8 notices are on file, all with a recorded resolution.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3429554. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 24 new building, 1 alteration filing. Its latest status categories are 16 approved, 9 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 380 Fourth Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 25 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
New 17 story mixed-use new building. Energy model provided for compliance with NYCECC - Baseline & proposed EN reports provided as Additional Supporting Documents (Other 2 & Other 3). Filing B00593338-I1.
Plumbing work in conjunction with construction of New Building. Filing B00593338-S6.
Mechanical work in conjunction with construction of 17-story new building. NYCECC compliance provided as Energy Model. See EN2 sheets, Baseline, and Proposed Model reports under GC filing (B00593338-I1). Filing B00593338-S5.
Superstructure work in conjunction with construction of 17-story new building. Foundation and SOE filed separately. Filing B00593338-S2.
Support of Excavation in conjunction with construction of 17-story new building. Foundation and superstructure filed separately. Filing B00593338-S4.
Foundation work in conjunction with construction of 17-story new building. Superstructure and SOE filed separately. Filing B00593338-S1.
Filing B00593338-S6 reached an approved status.
Sprinkler/Standpipe installation in conjunction with construction of new building. Filing B00593338-S7.
Filing B00593338-S7 reached an approved status.
Filing B00593338-S2 reached an approved status.
Curb cut along Atlantic Avenue for 17-story new building. Filing B00593338-S3.
Filing B00593338-S3 reached an approved status.
Temporary dry standpipe in conjunction with construction of New Building. Filing B00593338-S8.
Filing B00593338-S8 reached an approved status.
Filing B00593338-S1 reached an approved status.
Filing B00593338-S4 reached an approved status.
Early Foundation element as shown on plans filed here within conjunction with NB application B00593338. Filing B00647959-I1.
Filing B00647959-I1 reached an approved status.
DOB lists a first permit date for B00647959-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00593338-S1. That is not by itself confirmation of activity on site.
Temporary dry standpipe in conjunction with construction of New Building. Filing B00593338-P2.
Sprinkler/Standpipe installation in conjunction with construction of new building. Filing B00593338-P3.
Plumbing work in conjunction with construction of New Building. Filing B00593338-P4.
Superstructure work in conjunction with construction of 17-story new building. Foundation and SOE filed separately. Filing B00593338-P1.
Curb cut along Atlantic Avenue for 17-story new building. Filing B00593338-P5.
Filing B00593338-P2 reached an approved status.
Filing B00593338-P3 reached an approved status.
Filing B00593338-P4 reached an approved status.
Foundation work in conjunction with construction of 17-story new building. Superstructure and SOE filed separately. Filing B00593338-P6.
Support of Excavation in conjunction with construction of 17-story new building. Foundation and superstructure filed separately. Filing B00593338-P7.
Filing B00593338-P1 reached an approved status.
Filing B00593338-P5 reached an approved status.
Filing B00593338-P6 reached an approved status.
Filing B00593338-P7 reached an approved status.
DOB lists a first permit date for B00593338-S4. That is not by itself confirmation of activity on site.
Filing B00593338-S5 reached an approved status.
DOB lists a first permit date for B00593338-S5. That is not by itself confirmation of activity on site.
The latest status recorded for B00593338-P1 is “Approved.”
The latest status recorded for B00593338-P2 is “Approved.”
The latest status recorded for B00593338-P3 is “Approved.”
The latest status recorded for B00593338-P4 is “Approved.”
The latest status recorded for B00593338-P5 is “Approved.”
The latest status recorded for B00593338-P6 is “Approved.”
The latest status recorded for B00593338-P7 is “Approved.”
Filing B00593338-I1 reached an approved status.
DOB lists a first permit date for B00593338-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00593338-S6. That is not by itself confirmation of activity on site.
Plumbing work in conjunction with construction of New Building. Filing B00593338-P8.
Filing B00593338-P8 reached an approved status.
The latest status recorded for B00593338-P8 is “Approved.”
DOB lists a first permit date for B00593338-S2. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00593338-S8. That is not by itself confirmation of activity on site.
Temporary dry standpipe in conjunction with construction of New Building. Filing B00593338-P9.
Filing B00593338-P9 reached an approved status.
The latest status recorded for B00593338-P9 is “Approved.”
DOB lists a first permit date for B00593338-S7. That is not by itself confirmation of activity on site.
Plumbing work in conjunction with construction of New Building. Filing B00593338-A1.
Filing B00593338-A1 reached an approved status.
The latest status recorded for B00593338-A1 is “Approved.”
New 17 story mixed-use new building. Energy model provided for compliance with NYCECC - Baseline & proposed EN reports provided as Additional Supporting Documents (Other 2 & Other 3). Filing B00593338-A3.
Mechanical work in conjunction with construction of 17-story new building. NYCECC compliance provided as Energy Model. See EN2 sheets, Baseline, and Proposed Model reports under GC filing (B00593338-I1). Filing B00593338-A2.
Filing B00593338-A2 reached an approved status.
The latest status recorded for B00593338-A2 is “Approved.”
DOB lists a first permit date for B00593338-S3. That is not by itself confirmation of activity on site.
Plumbing work in conjunction with construction of New Building. Filing B00593338-A4.
Filing B00593338-A3 reached an approved status.
The latest status recorded for B00593338-A3 is “Approved.”
Filing B00593338-A4 reached an approved status.
The latest status recorded for B00593338-A4 is “Approved.”
DOB recorded a sign-off for B00593338-S3.
The latest status recorded for B00593338-S3 is “LOC Issued.”
DOB recorded a sign-off for B00593338-S8.
The latest status recorded for B00593338-S8 is “LOC Issued.”
DOB recorded a sign-off for B00593338-S7.
The latest status recorded for B00593338-S7 is “LOC Issued.”
Plumbing work in conjunction with construction of New Building. Filing B00593338-A5.
Filing B00593338-A5 reached an approved status.
The latest status recorded for B00593338-A5 is “Approved.”
DOB recorded a sign-off for B00593338-S4.
The latest status recorded for B00593338-S4 is “LOC Issued.”
DOB recorded a sign-off for B00593338-S5.
The latest status recorded for B00593338-S5 is “LOC Issued.”
DOB recorded a sign-off for B00593338-S2.
The latest status recorded for B00593338-S2 is “LOC Issued.”
DOB recorded a sign-off for B00593338-S1.
The latest status recorded for B00593338-S1 is “LOC Issued.”
DOB recorded a sign-off for B00647959-I1.
The latest status recorded for B00647959-I1 is “LOC Issued.”
DOB recorded a sign-off for B00593338-S6.
The latest status recorded for B00593338-S6 is “LOC Issued.”
New 17 story mixed-use new building. Energy model provided for compliance with NYCECC - Baseline & proposed EN reports provided as Additional Supporting Documents (Other 2 & Other 3). Filing B00593338-A8.
Filing B00593338-A8 reached an approved status.
The latest status recorded for B00593338-A8 is “Approved.”
The latest status recorded for B00593338-I1 is “Permit Entire.”