NYC DOB record · B00593338-P4

380 Fourth Avenue

380 Fourth Avenue, Brooklyn, NY 11215

New building filing in Carroll Gardens-Cobble Hill-Gowanus-Red Hook, Brooklyn. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedNew building

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00593338-P4

380 Fourth Avenue

Brooklyn, NY 11215

New building · status dated May 17, 2023

Current record
Approved
Proposed scale
17 stories
Dwelling units
197
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00593338-P4 as a new building at 380 Fourth Avenue, Brooklyn, NY 11215. Its latest published status category is Approved, dated May 17, 2023. The filing records 17 proposed stories and 197 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Approved
Latest status date
May 17, 2023
Proposed scale
17 proposed stories and 197 proposed dwelling units
The building, not the filingEvery filing at BIN 3429554, with the parcel and violation recordApplicant of recordSee the 142 filings that name Ettinger Engineering Associates
FiledOct 17, 2022
Current recordApproved
Proposed scale17 stories
Recorded cost$1,000

What the filing says

A public-record reading of the proposed work.

Plumbing work in conjunction with construction of New Building.

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 17-story elevator apartment building built in 2024, with 197 homes, on a 20,000 sq ft lot.

Built
2024
Last altered
2023
Floors
17
Residential units
197
Building type
Elevator apartment building
Land use
Mixed residential and commercial
Zoning district
C4-4D
Lot area
20,000 sq ft
Building area
205,749 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00593338-P4.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,351 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00593338-P4
BBL
3009800077
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
17
Existing dwelling units
Empty in the source
Proposed dwelling units
197
plumbing