Building record · BIN 3429678

30 Inspiration Lane

30 Inspiration Lane, Brooklyn, NY 11207

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 2 independently sourced records, including 1 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 3429678

30 Inspiration Lane

Spring Creek-Starrett City, Brooklyn

A consolidated public-record view · updated Oct 5, 2026

DOB filings
2
Active-status
1
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings2
Open or active-status records1
First included filingApr 14, 2023
Latest recorded changeOct 5, 2026

The lot

What is already here?

The lot holds a 15-story condominium built in 2024, on a 68,457 sq ft lot.

  1. Floors 2–15Nothing on record
  2. Floor 1Street levelStreet level.
  • Street levelWhat the lot is recorded as
  • Above the southern skylineFrom about floor 16 — the tallest thing within 60 m to the south is 47.2 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 46 m over 15 floors, as the city counts them. 1 run of floors has something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
2024
Last altered
2024
Floors
15
Building type
Condominium
Zoning district
R7-2
Lot area
68,457 sq ft
Building area
288,045 sq ft

Owner of record

COUNCIL TOWERS III HOUSING DEVELOPMENT FUND CORPORATION

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 7, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

The Department of Buildings has 2 open notices on record for this building, out of 2 notices on file; the most recent was issued Jul 18, 2025.

  • Construction

    Issued Jul 18, 2025 — VIO25-50512

  • Plumbing

    Issued Jul 10, 2025 — BASED ON LIC # 1343 BEING INACTIVE, STOP ALL PLUMBING WORK UNDER JOB #B00861527 IMMEDIATELY.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 7, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3429678. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 2 new building. Its latest status categories are 1 approved, 1 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Apr 14, 2023
Latest recorded change
Oct 5, 2026
Highest proposed story count
15 stories
Highest proposed unit count
386 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 30 Inspiration Lane.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 2 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. New building filed

    Construct new fifteen (15) story mixed use building as per plans filed. Filing B00851722-I1.

    01
  2. New building filed

    Installation of temporary dry standpipe system during construction. Filing B00851722-S8.

    02
  3. New building approved

    Filing B00851722-I1 reached an approved status.

    03
  4. New building approved

    Filing B00851722-S8 reached an approved status.

    04
  5. Permit recorded for new building

    DOB lists a first permit date for B00851722-I1. That is not by itself confirmation of activity on site.

    05
  6. Permit recorded for new building

    DOB lists a first permit date for B00851722-S8. That is not by itself confirmation of activity on site.

    06
  7. New building now approved

    The latest status recorded for B00851722-I1 is “Permit Entire.”

    07
  8. New building signed off

    DOB recorded a sign-off for B00851722-S8.

    08
  9. New building now completed

    The latest status recorded for B00851722-S8 is “LOC Issued.”

    09