What the filing says
A public-record reading of the proposed work.
Bldg# 1: temporary roof-overhead protection as per drawings during nb const, filed sep. roof-overhead protection shall comply with ch #33 of the NYC bc. no change in use,occupancy or egress under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 15-story condominium built in 2024, on a 68,457 sq ft lot.
- Built
- 2024
- Last altered
- 2024
- Floors
- 15
- Building type
- Condominium
- Zoning district
- R7-2
- Lot area
- 68,457 sq ft
- Building area
- 288,045 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 17, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 2 notices on file; the most recent was issued Jul 18, 2025.
- Construction
Issued Jul 18, 2025 — VIO25-50512
- Plumbing
Issued Jul 10, 2025 — BASED ON LIC # 1343 BEING INACTIVE, STOP ALL PLUMBING WORK UNDER JOB #B00861527 IMMEDIATELY.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 17, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01113810-S2.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded04
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 82,285 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01113810-S2
- BBL
- 3044347501
- Postal code
- 11207 · 3288 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 386