Building record · BIN 4437037

19-19 24 Avenue

19-19 24 Avenue, Queens, NY 11105

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 8 independently sourced records, including 8 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 4437037

19-19 24 Avenue

Astoria (North)-Ditmars-Steinway, Queens

A consolidated public-record view · updated Sep 30, 2026

DOB filings
8
Active-status
8
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings8
Open or active-status records8
First included filingJul 15, 2024
Latest recorded changeSep 30, 2026

The lot

What is already here?

The lot holds a 7-story condominium built in 1920, with 186 homes, on a 72,653 sq ft lot.

  1. Floors 6–7Above the southern skylineAbove the tallest building within sixty metres to the south, which stands 16.6 m. Nothing on that side reaches this floor.
  2. Floors 2–5Homes186 homes are recorded on this lot — about 31 homes to a floor. The city does not publish which floor any of them is on.
  3. Floor 1Street levelStreet level. The lot is recorded as mixed residential and commercial, so this floor is where the commercial space is.
  • Street levelMixed residential and commercial
  • Homes186 recorded on the lot
  • Above the southern skylineFrom about floor 6 — the tallest thing within 60 m to the south is 16.6 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 26 m over 7 floors, as the city counts them. 3 runs of floors have something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
1920
Floors
7
Residential units
186
Building type
Condominium
Land use
Mixed residential and commercial
Zoning district
R7A
Lot area
72,653 sq ft
Building area
406,030 sq ft

Housing violations

17 violations are open against this address under the Housing Maintenance Code. 2 of them are the class the city calls immediately hazardous.

  • 2Immediately hazardous
  • 12Hazardous
  • 3Non-hazardous
  • 0Information order

Open means the Department of Housing Preservation and Development has not recorded it as corrected, which is not the same as nobody having fixed it. The city publishes the apartment each was written against; that is not carried here, because a count says a building has a problem and an apartment number says whose.

What it sold for

4 apartments on this tax block changed hands in the year the city last published, at a median of $630,000, from 440,000 to 710,000.

Recorded sale prices from the Department of Finance’s rolling file, covering the year to Aug 31, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.

Owner of record

STEVEN KALANTGOPOULOS REVOCABLE TRUST

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 2, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

On the market here

4 homes at this address are currently listed for sale by Coldwell Banker and Corcoran. Prices move; the brokerage’s own page is the one that is current, and every row here links to it.

Homes listed for sale or rent at 19-19 24 Avenue
UnitRoomsSizePricePer sq ftListed by
Unit L413For sale2 bd · 2 ba1,496 sq ft139 m²$795,000$531Coldwell Banker
Unit L319For sale1 bd · 1 ba868 sq ft81 m²$590,000$680Coldwell Banker
Unit L319For salePrice not readCorcoran
Unit L503For salePrice not readColdwell Banker

Read from the brokerages’ own published listings on October 2, 2026. A home drops off this table the next time they publish a list without it — usually because it sold or let, though a listing can also expire or be withdrawn. What we know is that it is no longer offered, which is why this shows what they have today rather than what we were told once. Everything on the market across the city.

Violation record

Are there open violations here?

The Department of Buildings has 13 open notices on record for this building, out of 71 notices on file; the most recent was issued Jun 20, 2023.

  • Low pressure boiler

    Issued Jun 20, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Jun 20, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Jun 20, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION

  • 10 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 2, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 4437037. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 8 alteration filing. Its latest status categories are 7 approved, 1 under review. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Jul 15, 2024
Latest recorded change
Sep 30, 2026
Highest proposed story count
Not stated
Highest proposed unit count
186 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 19-19 24 Avenue.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 8 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. live load 300psf. Filing Q01078790-I1.

    01
  2. Permit recorded for alteration

    DOB lists a first permit date for Q01078790-I1. That is not by itself confirmation of activity on site.

    02
  3. Alteration filed

    Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. Filing Q01364322-I1.

    03
  4. Permit recorded for alteration

    DOB lists a first permit date for Q01364322-I1. That is not by itself confirmation of activity on site.

    04
  5. Alteration filed

    Installation of a temporary Material storage per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. Filing Q01413748-I1.

    05
  6. Permit recorded for alteration

    DOB lists a first permit date for Q01413748-I1. That is not by itself confirmation of activity on site.

    06
  7. Alteration filed

    Installation of a suspended scaffold for facade inspection and repair as per plan submitted. Filing Q01445678-I1.

    07
  8. Alteration filed

    Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. Filing Q01364322-P2.

    08
  9. Alteration now approved

    The latest status recorded for Q01364322-I1 is “Permit Entire.”

    09
  10. Alteration approved

    Filing Q01364322-P2 reached an approved status.

    010
  11. Alteration now approved

    The latest status recorded for Q01364322-P2 is “Approved.”

    011
  12. Alteration approved

    Filing Q01445678-I1 reached an approved status.

    012
  13. Permit recorded for alteration

    DOB lists a first permit date for Q01445678-I1. That is not by itself confirmation of activity on site.

    013
  14. Alteration now approved

    The latest status recorded for Q01445678-I1 is “Permit Entire.”

    014
  15. Alteration filed

    Installation of a suspended scaffold for facade inspection and repair as per plan submitted. Filing Q01445678-P1.

    015
  16. Alteration now under review

    The latest status recorded for Q01445678-P1 is “Pending Plan Examiner Assignment.”

    016
  17. Alteration filed

    Installation of a temporary Material storage per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. Filing Q01413748-P1.

    017
  18. Alteration filed

    Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. live load 300psf. Filing Q01078790-P2.

    018
  19. Alteration approved

    Filing Q01078790-P2 reached an approved status.

    019
  20. Alteration now approved

    The latest status recorded for Q01078790-P2 is “Approved.”

    020
  21. Alteration now approved

    The latest status recorded for Q01078790-I1 is “Permit Entire.”

    021
  22. Alteration approved

    Filing Q01413748-P1 reached an approved status.

    022
  23. Alteration now approved

    The latest status recorded for Q01413748-P1 is “Approved.”

    023
  24. Alteration now approved

    The latest status recorded for Q01413748-I1 is “Permit Entire.”

    024