Building record · BIN 4439898

56-45 Main Street

56-45 Main Street, Queens, NY 11355

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 12 independently sourced records, including 10 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 4439898

56-45 Main Street

Queensboro Hill, Queens

A consolidated public-record view · updated Sep 16, 2026

DOB filings
12
Active-status
10
Recorded addresses
2
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings12
Open or active-status records10
First included filingJan 10, 2024
Latest recorded changeSep 16, 2026

The lot

What is already here?

The lot holds a 8-story health facility built in 1957, on a 234,336 sq ft lot.

  1. Floors 2–8Nothing on record
  2. Floor 1Street levelStreet level. The lot is recorded as public facilities and institutions.
  • Street levelPublic facilities and institutions
Drawn from the outline and roof height the Department of City Planning publishes for this building: 31.4 m over 8 floors, as the city counts them. 1 run of floors has something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor.
Built
1957
Last altered
1999
Floors
8
Residential units
0
Building type
Health facility
Land use
Public facilities and institutions
Zoning district
R6
Lot area
234,336 sq ft
Building area
577,654 sq ft

Owner of record

NEW YORK QUEENS CHARTER VENTURES, INC.

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 18, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

The Department of Buildings has 8 open notices on record for this building, out of 283 notices on file; the most recent was issued Jun 30, 2023.

  • High pressure boiler

    Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION

  • High pressure boiler

    Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION

  • Retaining

    Issued Dec 15, 2022 — FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09

  • 5 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 18, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 4439898. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 12 alteration filing. Its latest status categories are 2 recorded as completed, 6 approved, 4 under review. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Jan 10, 2024
Latest recorded change
Sep 16, 2026
Highest proposed story count
8 stories
Highest proposed unit count
Not stated

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 56-45 Main Street.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 12 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Nypq - ac 3, 4, 5 replacements - mechanical modifications as per plans filed herewith. no change in use, egress, or occupancy. Filing Q00962203-I1.

    01
  2. Alteration approved

    Filing Q00962203-I1 reached an approved status.

    02
  3. Permit recorded for alteration

    DOB lists a first permit date for Q00962203-I1. That is not by itself confirmation of activity on site.

    03
  4. Alteration filed

    Plumbing modifications on 1st Floor as per plans filed herewith. Filed in conjunction with GC, MS and SP applications. No change in egress, occupancy, or use. Filing Q01153918-S2.

    04
  5. Alteration filed

    Mechanical modifications on 1st and 3rd Floor as shown on plans filed herewith. Filed in conjunction with GC, PL, and SP applications. No change in egress, occupancy or use. Filing Q01153918-S1.

    05
  6. Alteration approved

    Filing Q01153918-S1 reached an approved status.

    06
  7. Alteration approved

    Filing Q01153918-S2 reached an approved status.

    07
  8. Permit recorded for alteration

    DOB lists a first permit date for Q01153918-S2. That is not by itself confirmation of activity on site.

    08
  9. Permit recorded for alteration

    DOB lists a first permit date for Q01153918-S1. That is not by itself confirmation of activity on site.

    09
  10. Alteration filed

    Nypq - linac construction upgrade - general construction including modifications to floors, ceilings, partitions and doors as per plans filed herewith. no change in use, egress, or occupancy. Filing Q01264528-I1.

    010
  11. Alteration approved

    Filing Q01264528-I1 reached an approved status.

    011
  12. Alteration filed

    Nypq - linac construction upgrade - structural modifications as per plans filed herewith. no change in use, egress, or occupancy. Filing Q01264528-S4.

    012
  13. Alteration approved

    Filing Q01264528-S4 reached an approved status.

    013
  14. Permit recorded for alteration

    DOB lists a first permit date for Q01264528-S4. That is not by itself confirmation of activity on site.

    014
  15. Permit recorded for alteration

    DOB lists a first permit date for Q01264528-I1. That is not by itself confirmation of activity on site.

    015
  16. Alteration filed

    NYPQ - Lab 9 - STRUCTURAL MODIFICATIONS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. Filing Q01323864-S4.

    016
  17. Alteration approved

    Filing Q01323864-S4 reached an approved status.

    017
  18. Permit recorded for alteration

    DOB lists a first permit date for Q01323864-S4. That is not by itself confirmation of activity on site.

    018
  19. Alteration filed

    Fit out_infusion 6th, 7th, 8th floors and roof - general construction modifications as per plans filed herewith. no change in use, egress or occupancy. Filing Q01384423-I1.

    019
  20. Alteration filed

    Fit out_infusion 6th, 7th floor and roof - sprinkler modifications as per plans filed herewith. no change in use, egress or occupancy. Filing Q01384423-S3.

    020
  21. Alteration filed

    Fit out_infusion 6th, 7th floors and roof - plumbing modifications as per plans filed herewith. no change in use, egress or occupancy. Filing Q01384423-S2.

    021
  22. Alteration filed

    Fit out_infusion 6th, 7th, 8th floors and roof - mechanical modifications as per plans filed herewith. no change in use, egress or occupancy. Filing Q01384423-S1.

    022
  23. Alteration filed

    NYPQ - Lab 9 - STRUCTURAL MODIFICATIONS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. Filing Q01323864-P1.

    023
  24. Alteration filed

    NYPQ - OR 4-9 Reno - STRUCTURAL INTERIOR RENOVATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. Filing Q01427923-S4.

    024
  25. Alteration now approved

    The latest status recorded for Q01323864-S4 is “Permit Entire.”

    025
  26. Alteration approved

    Filing Q01323864-P1 reached an approved status.

    026
  27. Alteration now approved

    The latest status recorded for Q01323864-P1 is “Approved.”

    027
  28. Alteration now under review

    The latest status recorded for Q01384423-I1 is “Plan Examiner Review.”

    028
  29. Alteration now approved

    The latest status recorded for Q01264528-S4 is “Permit Entire.”

    029
  30. Alteration signed off

    DOB recorded a sign-off for Q01153918-S1.

    030
  31. Alteration now completed

    The latest status recorded for Q01153918-S1 is “LOC Issued.”

    031
  32. Alteration approved

    Filing Q01427923-S4 reached an approved status.

    032
  33. Alteration now approved

    The latest status recorded for Q01427923-S4 is “Approved.”

    033
  34. Alteration now approved

    The latest status recorded for Q01264528-I1 is “Permit Entire.”

    034
  35. Alteration now under review

    The latest status recorded for Q01384423-S3 is “Plan Examiner Review.”

    035
  36. Alteration now under review

    The latest status recorded for Q01384423-S2 is “Plan Examiner Review.”

    036
  37. Alteration now under review

    The latest status recorded for Q01384423-S1 is “Plan Examiner Review.”

    037
  38. Alteration signed off

    DOB recorded a sign-off for Q01153918-S2.

    038
  39. Alteration now completed

    The latest status recorded for Q01153918-S2 is “LOC Issued.”

    039
  40. Alteration now approved

    The latest status recorded for Q00962203-I1 is “Permit Entire.”

    040