NYC DOB record · Q01153918-S1

56-45 Main Street

56-45 Main Street, Queens, NY 11355

Alteration filing in Queensboro Hill, Queens. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 2, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · Q01153918-S1

56-45 Main Street

Queens, NY 11355

Alteration filing · status dated Aug 28, 2026

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing Q01153918-S1 as a alteration filing at 56-45 Main Street, Queens, NY 11355. Its latest published status category is Recorded as completed, dated Aug 28, 2026. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Aug 28, 2026
Proposed scale
Not stated in this filing
The building, not the filingopen housing violations, the owner of record and every filing at BIN 4439898Applicant of recordSee the 376 filings that name Cosentini Associates
FiledFeb 5, 2025
Current recordRecorded as completed
Proposed scaleNot specified
Recorded cost$101,500

What the filing says

A public-record reading of the proposed work.

Mechanical modifications on 1st and 3rd Floor as shown on plans filed herewith. Filed in conjunction with GC, PL, and SP applications. No change in egress, occupancy or use.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 8-story health facility built in 1957, on a 234,336 sq ft lot.

Built
1957
Last altered
1999
Floors
8
Residential units
0
Building type
Health facility
Land use
Public facilities and institutions
Zoning district
R6
Lot area
234,336 sq ft
Building area
577,654 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 18, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 8 open notices on record for this building, out of 283 notices on file; the most recent was issued Jun 30, 2023.

  • High pressure boiler

    Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION

  • High pressure boiler

    Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION

  • Retaining

    Issued Dec 15, 2022 — FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09

  • 5 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 18, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing Q01153918-S1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
Q01153918-S1
BBL
4051650001
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
0
Proposed dwelling units
0
mechanical