NYC DOB record · M01479875-I1

1 Beekman Street

1 Beekman Street, Manhattan, NY 10038

Alteration filing in Financial District-Battery Park City, Manhattan. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Nov 20, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01479875-I1

1 Beekman Street

Manhattan, NY 10038

Alteration filing · status dated Nov 18, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
30
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01479875-I1 as a alteration filing at 1 Beekman Street, Manhattan, NY 10038. Its latest published status category is Approved, dated Nov 18, 2026. The filing records 30 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Nov 18, 2026
Proposed scale
30 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 1090476Applicant of recordSee the 1 filings that name Surface Design Group
FiledNov 17, 2026
Current recordApproved
Proposed scale30 units
Recorded cost$24,000

What the filing says

A public-record reading of the proposed work.

Facade structural netting filing at 1 Beekman, aka 33 Park Row as per plans filed herewith. No change to change, use, egress or occupancy

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 23-story condominium built in 2016, with 30 homes, on a 4,861 sq ft lot.

Built
2016
Floors
23
Residential units
30
Building type
Condominium
Land use
Mixed residential and commercial
Zoning district
C5-5
Lot area
4,861 sq ft
Building area
67,066 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 20, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 3 open notices on record for this building, out of 81 notices on file; the most recent was issued Oct 8, 2026.

  • Construction

    Issued Oct 8, 2026 — EWO

  • Construction

    Issued Oct 8, 2026 — FTM BLDG EXTERIOR FACADE & APPURTANCES DUE TO DISPLACE BULGING BRK MAS REMEDY:OWNER TO IMMED RETAIN NYS LIC PROF W/QEWI CERT & FACADE MASONRY EXPERIENCE TO INSPECT & EVALUATE 100% HANDS ON ENTIRE MASONRY FACADE, ALL EXPS CONTAINING BRICK,VENEER MASONRY & DET SAFE OF SAME. QEWI TO SUBMIT REPORT OF FINDINGS TO FACADES@BUILDINGS.NYC.GOV BY 10/19/26

  • Construction

    Issued Oct 8, 2026 — EWO DUE TO DEFECTIVE,DISPLACED,BULGING BRICK MASONRY W/SECTION LOSS & LOOSE MATERIAL @ EXP2S.REMEDY:OWNER TO IMMEDIATELY TAKE/PROVIDE ADEQUA SAFETY MEASURES TO SECURE/PROTECT DISPLACED,HAZARDOUS FACADE MATERIAL & MAKE ADEQUATE REPAIRS U/FULL SUPERVISION OF A NYS LICENSED PROFESSIONAL

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 20, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01479875-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 23 days of being filed and a quarter take longer than 4 months, measured across 100,367 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01479875-I1
BBL
1000907505
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
30
Proposed dwelling units
30