What the filing says
A public-record reading of the proposed work.
Facade and parking garage repairs as per plans submitted herewith. there is no change in use, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story garage or fuel station built in 1963, on a 7,038 sq ft lot.
- Built
- 1963
- Floors
- 6
- Residential units
- 0
- Building type
- Garage or fuel station
- Land use
- Parking facilities
- Zoning district
- C6-4
- Lot area
- 7,038 sq ft
- Building area
- 36,246 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 20, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 34 notices on file; the most recent was issued Jun 21, 2023.
- Construction
Issued Jun 21, 2023 — FTM.FEU OBSRVD 1.SOME OF THE EXISTNG CNCRETE SLAB HAS SVRLYDETERIORATD W/EXPOSD REBAR,2.SOME OF THE STEELFRAMNG HAD RUSTD W/SECTNLOSS,2.CRCKS ON EXISTNG CONC SLAB,4.MULT VERT CRCKS ON MASNRY PIES ON.IMMEDIATELY COMPLY WITH COMMISSIONER'S ORDER 341364(051223FEU10101ZT)TO REPAIR BUILDING UNDER PERMIT
- Construction
Issued May 12, 2023 — FTM.OBSERVED 1.SOME OF THE EXISTING CNCRETE SLAB HAS SVRLY DETERIORATD W/EXPOSD REBAR,2.SOME OF THE STEELFRAMNG HAD RUSTD W/SECTNLOSS,3.CRCKS ON EXISTING CONC SLAB,4.MULT VERT CRCKS ON MASONRY PIES ON.OWNR TO IMMED RTAIN NYS PE TO EVAL THE ENT BLDG STRCTRE,DET THE STRCTRE STABILITY&PREPARE/FILE RPAIRS DRWNGS.BLDG TO BE RPAIRD UNDR PRMT
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 20, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M00985079-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M00985079-I1
- BIN
- 1001279
- BBL
- 1000920034
- Postal code
- 10038 · 154 filings
- Review type
- Standard Plan Examination
- Existing stories
- 5
- Proposed stories
- 5
- Existing dwelling units
- 0
- Proposed dwelling units
- 0