What the filing says
A public-record reading of the proposed work.
Installation of a heavy duty sidewalk shed as per plans during general construction. no change in use, egress or occupancy. sidewalk shed to comply with chapter 33 of NYC building code of 2014.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 13-story office building built in 1887, on a 17,025 sq ft lot.
- Built
- 1887
- Floors
- 13
- Residential units
- 0
- Building type
- Office building
- Land use
- Commercial and office
- Zoning district
- C5-5
- Lot area
- 17,025 sq ft
- Building area
- 206,480 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 30, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 8 open notices on record for this building, out of 103 notices on file; the most recent was issued Jan 8, 2026.
- Construction
Issued Jan 8, 2026 — EMERGENCY WORK ORDER DUE TO MULTIPLE AREAS OF SPALLING/SPALLED STONEWORK THROUGHOUT FACADE. REMEDY: IMMEDIATELY PROVIDE SIDEWALK SHED AT EXPOSURE #1 EAST ELEVATION, EXPOSURE #2 SOUTH ELEVATION AND EXPOSURE #3 WEST ELEVATION UNDER DIRECTION OF LICENSED PROFESSIONAL
- Construction
Issued Jan 8, 2026 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. NOTE: OBSERVED DEFECTED CONDITIONS AT ALL EXPOSURES. MISSING/SPALLING STONES. ROOF AREA: CRACKS AT BULK HEAD. REMEDY: REPAIR AND/OR REPLACE
- Construction
Issued Jul 31, 2025 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. OBSERVED SPALLING STONE WORK IN MULTIPLE LOCATIONS ON EXPOSURES 1 AND 2 REMEDY: REPAIR AND OR REPLACE
5 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 29, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M00530812-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M00530812-I1
- BBL
- 1000130001
- Postal code
- 10004 · 106 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0








