What the filing says
A public-record reading of the proposed work.
Replacement of HVAC units on the first floor and mezzanine roof with a total capacity of 3.5 tons, work being performed in the atm room and basement. no change to egress, use, or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 13-story office building built in 1887, on a 17,025 sq ft lot.
- Built
- 1887
- Floors
- 13
- Residential units
- 0
- Building type
- Office building
- Land use
- Commercial and office
- Zoning district
- C5-5
- Lot area
- 17,025 sq ft
- Building area
- 206,480 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 30, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 8 open notices on record for this building, out of 103 notices on file; the most recent was issued Jan 8, 2026.
- Construction
Issued Jan 8, 2026 — EMERGENCY WORK ORDER DUE TO MULTIPLE AREAS OF SPALLING/SPALLED STONEWORK THROUGHOUT FACADE. REMEDY: IMMEDIATELY PROVIDE SIDEWALK SHED AT EXPOSURE #1 EAST ELEVATION, EXPOSURE #2 SOUTH ELEVATION AND EXPOSURE #3 WEST ELEVATION UNDER DIRECTION OF LICENSED PROFESSIONAL
- Construction
Issued Jan 8, 2026 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. NOTE: OBSERVED DEFECTED CONDITIONS AT ALL EXPOSURES. MISSING/SPALLING STONES. ROOF AREA: CRACKS AT BULK HEAD. REMEDY: REPAIR AND/OR REPLACE
- Construction
Issued Jul 31, 2025 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. OBSERVED SPALLING STONE WORK IN MULTIPLE LOCATIONS ON EXPOSURES 1 AND 2 REMEDY: REPAIR AND OR REPLACE
5 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 29, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01393868-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01393868-I1
- BBL
- 1000130001
- Postal code
- 10004 · 106 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0