NYC DOB record · M01438200-I1

1 Park Row

1 Park Row, Manhattan, NY 10038

Alteration filing in Financial District-Battery Park City, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 2, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01438200-I1

1 Park Row

Manhattan, NY 10038

Alteration filing · status dated Aug 28, 2026

Current record
Approved
Proposed scale
24 stories
Dwelling units
62
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01438200-I1 as a alteration filing at 1 Park Row, Manhattan, NY 10038. Its latest published status category is Approved, dated Aug 28, 2026. The filing records 24 proposed stories and 62 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Aug 28, 2026
Proposed scale
24 proposed stories and 62 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 1085949Applicant of recordSee the 15 filings that name Ware Malcomb
FiledAug 21, 2026
Current recordApproved
Proposed scale24 stories
Recorded cost$410,000

What the filing says

A public-record reading of the proposed work.

Renovation of the 1st floor for an office build out, minor partition work, replace wall finishes, floor and ceiling tiles. Subsequent filings for plumbing & mechanical to be filed. No change in use, egress or occupancy

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 23-story condominium built in 2023, with 62 homes, on a 5,672 sq ft lot.

Built
2023
Last altered
2001
Floors
23
Residential units
62
Building type
Condominium
Land use
Mixed residential and commercial
Zoning district
C5-5
Lot area
5,672 sq ft
Building area
77,202 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 22, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 6 open notices on record for this building, out of 181 notices on file; the most recent was issued Jan 21, 2022.

  • Construction

    Issued Jan 21, 2022 — WORK WITHOUT A PERMIT,HEAVY DEMOLITION MACHINERY BROKK 250 IN USE

  • Construction

    Issued Jun 3, 2020 — BOROUGH COMMISSIONER ISSUED A SWO TO APPLICATION#123888506 FOR FAILURE TO COMPLY WITH THE PROVISION OF THE AC. STOP ALL WORK IMMEDIATELY AND MAKE SITE SAFE.

  • Construction

    Issued May 26, 2020 — WORKING WITHOUT PERMIT FOR ALTERATION 1 CONTRUTION

  • 3 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 19, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01438200-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01438200-I1
BBL
1000907506
Review type
Professional Certification
Existing stories
24
Proposed stories
24
Existing dwelling units
62
Proposed dwelling units
62
General construction