What the filing says
A public-record reading of the proposed work.
EIED issued for Fire damage to a detached private dwelling located at 1 Utica Walk Queens NY 11697. Full Demolition
Street Futures classifies this record as a full demolition based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 1-story one-family home built in 1938, with 1887 homes, on a 12,253,428 sq ft lot.
- Built
- 1938
- Floors
- 1
- Residential units
- 1887
- Building type
- One-family home
- Land use
- One and two family homes
- Zoning district
- R4
- Lot area
- 12,253,428 sq ft
- Building area
- 1,600,000 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 25, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 3 notices on file; the most recent was issued Sep 19, 2025.
- Immediate
Issued Sep 19, 2025 — REMEDY: DEMOLISH STRUCTURE AND GRADE SITE
- Construction
Issued Sep 11, 2025 — STRUCTURE RENDERED NON COMPLIANT DUE TO FIRE. AT THE TIME OF INSPECTION OBSERVED EXTENSIVE FIRE, WATER AND SOME DAMAGE THROUGHOUT PREMISES. ALSO APPROXIMATELY 25% OF THE ROOF IS MISSING AND ALL WINDOWS MISSING EXPOSING PREMISES TO THE ELEMENTS.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 25, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q01329182-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 86,498 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q01329182-I1
- BIN
- 4465663
- BBL
- 4163500400
- Postal code
- 11697 · 36 filings
- Review type
- Standard Plan Examination
- Existing stories
- 2
- Proposed stories
- Empty in the source
- Existing dwelling units
- 1
- Proposed dwelling units
- Empty in the source