NYC DOB record · B00469488-I1

100 Congress Street

100 Congress Street, Brooklyn, NY 11201

Alteration filing in Carroll Gardens-Cobble Hill-Gowanus-Red Hook, Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00469488-I1

100 Congress Street

Brooklyn, NY 11201

Alteration filing · status dated May 5, 2021

Current record
Approved
Proposed scale
6 stories
Dwelling units
30
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00469488-I1 as a alteration filing at 100 Congress Street, Brooklyn, NY 11201. Its latest published status category is Approved, dated May 5, 2021. The filing records 6 proposed stories and 30 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
May 5, 2021
Proposed scale
6 proposed stories and 30 proposed dwelling units
Complete building dossierView all 3 filings associated with BIN 3396835Applicant of recordSee the 12 filings that name Joseph K. Blum CO. LLP
FiledFeb 21, 2021
Current recordApproved
Proposed scale6 stories
Recorded cost$252,999

What the filing says

A public-record reading of the proposed work.

Repair/replacement of the main roof and 6th-floor roof, facade repair/replacement to include masonry, pointing, sills, lintels, concrete patching, caulking.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 6-story condominium built in 2009, with 30 homes, on a 11,700 sq ft lot.

Built
2009
Floors
6
Residential units
30
Building type
Condominium
Land use
Elevator apartments
Zoning district
R6A
Lot area
11,700 sq ft
Building area
36,093 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

No open violations are recorded for this building. 15 notices are on file, all with a recorded resolution.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00469488-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00469488-I1
BBL
3002997501
Review type
Standard Plan Examination
Existing stories
6
Proposed stories
6
Existing dwelling units
30
Proposed dwelling units
30
General construction