NYC DOB record · M01378117-I1

100 Washington Square East

100 Washington Square East, Manhattan, NY 10003

Alteration filing in Greenwich Village, Manhattan. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 12, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01378117-I1

100 Washington Square East

Manhattan, NY 10003

Alteration filing · status dated Sep 9, 2026

Current record
Approved
Proposed scale
11 stories
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01378117-I1 as a alteration filing at 100 Washington Square East, Manhattan, NY 10003. Its latest published status category is Approved, dated Sep 9, 2026. The filing records 11 proposed stories.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 9, 2026
Proposed scale
11 proposed stories
Applicant of recordSee the 2 filings that name Richard Gonzalez Architect PLLC
FiledMay 22, 2026
Current recordApproved
Proposed scale11 stories
Recorded cost$120,000

What the filing says

A public-record reading of the proposed work.

Installation of rated enclosure to an existing gas service line in the rear yard of the property , as per plans.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 10-story educational building built in 1900, on a 17,859 sq ft lot.

Built
1900
Last altered
1922
Floors
10
Residential units
0
Building type
Educational building
Land use
Public facilities and institutions
Zoning district
R7-2
Lot area
17,859 sq ft
Building area
180,000 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 12, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 3 open notices on record for this building, out of 98 notices on file; the most recent was issued Dec 1, 2022.

  • Failure to post energy

    Issued Dec 1, 2022 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3

  • Non-residential elevator periodic

    Issued Dec 17, 2021 — FAILURE TO PERFORM CATEGORY 5 INSPECTION

  • Local law 10/81 -

    Issued Jan 13, 1997

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 12, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01378117-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01378117-I1
BIN
1008820
BBL
1005470001
Review type
Standard Plan Examination
Existing stories
11
Proposed stories
11
Existing dwelling units
0
Proposed dwelling units
0
General construction