What the filing says
A public-record reading of the proposed work.
Install suspended scaffolding and roof hoist in order to perform facade exterior work. facade inspections to be done. sidewalk shed to be installed under separate application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5-story walk-up apartment building built in 1928, with 46 homes, on a 9,000 sq ft lot.
- Built
- 1928
- Last altered
- 1991
- Floors
- 5
- Residential units
- 46
- Building type
- Walk-up apartment building
- Land use
- Walk-up apartments
- Zoning district
- R7-1
- Lot area
- 9,000 sq ft
- Building area
- 39,000 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 28, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 12 notices on file; the most recent was issued Nov 12, 2025.
- Construction
Issued Nov 12, 2025 — FTC W/COMMISSIONER'S ORDER CONTROL#347911 VIO#100125PI20401SB DATED 10/01/25 REQUIRING OWNER TO START BLDG REPAIRS UNDER PERMIT. AS OF 11/12/25 THERE ARE NO JOBS FILED IN BIS OR DOBNOW TO REPAIR BLDG IMMED COMPLY W/COMMISSIONER'S ORDER CONTROL#347911 VIO# 100125PI20401SB TO REPAIR BLDG UNDER PERMIT
- Construction
Issued Oct 1, 2025 — FTM BLDG IN CODE COMPLIANT MANNER-OBSVD @ EXP1 DETERIORATED MORTAR JOINTS & STEP CRAKCS @ THE PARAPET @ EXP2. OBSVD DAMAGED/CRACKED STUCCO & DETERIORATED MORTAR JOINTS @ THE CHIMNEY. OWNER TO IMMED RETAIN NYSPE TO EVAL THE ENTIRE BLDG DETERMINE STRUCT STAB & PREPARE/ FILE REPAIR DWGS. REPAIR WORK UNDER PERMIT START WORK BY 11/1/25
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 28, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01176880-S4.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 71,094 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01176880-S4
- BIN
- 2003472
- BBL
- 2025260006
- Postal code
- 10452 · 171 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- Empty in the source








