NYC DOB record · X01303794-S1

1093 Jerome Avenue

1093 Jerome Avenue, Bronx, NY 10452

Full demolition filing in Highbridge, Bronx. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedFull demolition

NYC Department of Buildings · w9ak-ipjd · accessed Oct 22, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · X01303794-S1

1093 Jerome Avenue

Bronx, NY 10452

Full demolition · status dated Oct 20, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing X01303794-S1 as a full demolition at 1093 Jerome Avenue, Bronx, NY 10452. Its latest published status category is Approved, dated Oct 20, 2026. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Full demolition
Latest status
Approved
Latest status date
Oct 20, 2026
Proposed scale
Not stated in this filing
The building, not the filingopen housing violations and every filing at BIN 2003062Applicant of recordSee the 90 filings that name Age Engineering, LLC
FiledMay 12, 2026
Current recordApproved
Proposed scaleNot specified
Recorded cost$7,000

What the filing says

A public-record reading of the proposed work.

Install 8' high plywood construction fence

Street Futures classifies this record as a full demolition based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 2-story walk-up apartment building built in 1925, with 9 homes, on a 5,000 sq ft lot.

Built
1925
Last altered
1995
Floors
2
Residential units
9
Building type
Walk-up apartment building
Land use
Mixed residential and commercial
Zoning district
R7-1
Lot area
5,000 sq ft
Building area
5,257 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 22, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 7 open notices on record for this building, out of 24 notices on file; the most recent was issued Nov 14, 2025.

  • Low pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION

  • Construction

    Issued Oct 31, 2025 — FTC W/COMMISSIONER'S ORDER CONTROL#3488184 VIO#090825PI20403TC DATED 09/08/25 REQUIRING OWNER TO PROVIDE A CORRECTION ACTION PLAN BY 09/22/25,START BLDG REPRS UNDER PERMIT BY 11/07/25&COMPL/SIGNED OFF BY 12/7/25 AS OF TODAY 10/31/25 A CAP&EVIDENCE OF COMPL WRK NOT REC'D IMMED COMPLY W/COMMISSIONER'S ORDER #348184 VIO#090825PI20403TC

  • Construction

    Issued Sep 8, 2025 — CORRECTIVE ACTION PLAN REQ'D-OBSVD SEPARATION OF MASONRY STAIRCASE FROM WALL @ EXP1. OBSVD BULGING AND SILODGED BRICKS BTWN 2FL WINDOWS @ EXP1. OWNER TO IMMED RETAIN REG DESIGN PROF TO EVAL ENTIRE BLDG & TO SUBMIT A CORRECTIVE ACTION PLAN TO PROACTIVEINSP@BUILDINGS.NYC.GOV BY 9/22/25. BLDG TO BE REPAIRED UNDER PERMIT STARTING 11/7/2025

  • 4 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 22, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing X01303794-S1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 84,915 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
X01303794-S1
BBL
2025050028
Review type
Professional Certification
Existing stories
2
Proposed stories
Empty in the source
Existing dwelling units
9
Proposed dwelling units
Empty in the source