What the filing says
A public-record reading of the proposed work.
Installation of heavy-duty sidewalk shed as per plans. no change in use occupancy or egress under this application. sidewalk shed shall comply with chapter 33 of the 2022 NYC building code.
Street Futures classifies this record as a full demolition based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2-story walk-up apartment building built in 1925, with 9 homes, on a 5,000 sq ft lot.
- Built
- 1925
- Last altered
- 1995
- Floors
- 2
- Residential units
- 9
- Building type
- Walk-up apartment building
- Land use
- Mixed residential and commercial
- Zoning district
- R7-1
- Lot area
- 5,000 sq ft
- Building area
- 5,257 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 31, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 7 open notices on record for this building, out of 24 notices on file; the most recent was issued Nov 14, 2025.
- Low pressure boiler
Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
- Construction
Issued Oct 31, 2025 — FTC W/COMMISSIONER'S ORDER CONTROL#3488184 VIO#090825PI20403TC DATED 09/08/25 REQUIRING OWNER TO PROVIDE A CORRECTION ACTION PLAN BY 09/22/25,START BLDG REPRS UNDER PERMIT BY 11/07/25&COMPL/SIGNED OFF BY 12/7/25 AS OF TODAY 10/31/25 A CAP&EVIDENCE OF COMPL WRK NOT REC'D IMMED COMPLY W/COMMISSIONER'S ORDER #348184 VIO#090825PI20403TC
- Construction
Issued Sep 8, 2025 — CORRECTIVE ACTION PLAN REQ'D-OBSVD SEPARATION OF MASONRY STAIRCASE FROM WALL @ EXP1. OBSVD BULGING AND SILODGED BRICKS BTWN 2FL WINDOWS @ EXP1. OWNER TO IMMED RETAIN REG DESIGN PROF TO EVAL ENTIRE BLDG & TO SUBMIT A CORRECTIVE ACTION PLAN TO PROACTIVEINSP@BUILDINGS.NYC.GOV BY 9/22/25. BLDG TO BE REPAIRED UNDER PERMIT STARTING 11/7/2025
4 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 31, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01303794-S3.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 90,393 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01303794-S3
- BBL
- 2025050028
- Postal code
- 10452 · 341 filings
- Review type
- Professional Certification
- Existing stories
- 2
- Proposed stories
- Empty in the source
- Existing dwelling units
- 9
- Proposed dwelling units
- Empty in the source