What the filing says
A public-record reading of the proposed work.
Structural repair work at tower, no change in use, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 4-story educational building built in 1929, on a 57,531 sq ft lot.
- Built
- 1929
- Last altered
- 1992
- Floors
- 4
- Residential units
- 0
- Building type
- Educational building
- Land use
- Public facilities and institutions
- Zoning district
- M3-1
- Lot area
- 57,531 sq ft
- Building area
- 37,499 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 3, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 31 notices on file; the most recent was issued Aug 21, 2026.
- Construction
Issued Aug 21, 2026 — EMERGENCY WORK ORDER DUE TO SEVERLY CRACKED STONE LINTEL @4FL, OPEN MORTAR JOINTS/SHIFTED STONE & 4FL LINTEL/EYEBROW, OPEN MORTAR JOINTS, DAMAGED/LEANING CANOPY EXP1 SOUTH. REMEDY: IMMEDIATELY INSTALL SIDEWALK SHED ALONG EXPOSURE 1 SOUTH (BARTLETT ST) UNDER DIRECTION OF A LICENSED PROFESSIONAL
- Construction
Issued Aug 21, 2026 — FTM. OBSRVD ON EXP 1 S.ELEV: MISSING MORTAR JOINTS @ 4TH FLLINTEL & PARPET; CRACKS IN LINTELS, OPEN MORTAR JOINTS IN SILL ON 4TH FL. EXP 2 W.ELEV: CRACK IN BRICK WORK @ 4TH FL LINTEL HEIGHT; CRACK IN MORTAR JOINT @ CONCRTE LINTEL; CRACK IN STUCCO, ERODING BRICK @ PARPET. EXP 3 N.ELEV: CRACK IN 3RD FL SPANDREL & @ PARPET. REMDY:REPAIR &/ORREPLACE
- Failure to
Issued Jan 1, 2012 — FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
1 further open notice is on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 3, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00953146-S2.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00953146-S2
- BBL
- 3022680001
- Postal code
- 11206 · 3093 filings
- Review type
- Professional Certification
- Existing stories
- 4
- Proposed stories
- 4
- Existing dwelling units
- 0
- Proposed dwelling units
- 0








