What the filing says
A public-record reading of the proposed work.
Installation of a heavy duty sidewalk shed as per plans in conjunction with general construction work. no change in use, egress or occupancy. sidewalk shed shall comply with 2022 NYC building code,chapter 33.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 4-story educational building built in 1929, on a 57,531 sq ft lot.
- Built
- 1929
- Last altered
- 1992
- Floors
- 4
- Residential units
- 0
- Building type
- Educational building
- Land use
- Public facilities and institutions
- Zoning district
- M3-1
- Lot area
- 57,531 sq ft
- Building area
- 37,499 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 3, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 31 notices on file; the most recent was issued Aug 21, 2026.
- Construction
Issued Aug 21, 2026 — EMERGENCY WORK ORDER DUE TO SEVERLY CRACKED STONE LINTEL @4FL, OPEN MORTAR JOINTS/SHIFTED STONE & 4FL LINTEL/EYEBROW, OPEN MORTAR JOINTS, DAMAGED/LEANING CANOPY EXP1 SOUTH. REMEDY: IMMEDIATELY INSTALL SIDEWALK SHED ALONG EXPOSURE 1 SOUTH (BARTLETT ST) UNDER DIRECTION OF A LICENSED PROFESSIONAL
- Construction
Issued Aug 21, 2026 — FTM. OBSRVD ON EXP 1 S.ELEV: MISSING MORTAR JOINTS @ 4TH FLLINTEL & PARPET; CRACKS IN LINTELS, OPEN MORTAR JOINTS IN SILL ON 4TH FL. EXP 2 W.ELEV: CRACK IN BRICK WORK @ 4TH FL LINTEL HEIGHT; CRACK IN MORTAR JOINT @ CONCRTE LINTEL; CRACK IN STUCCO, ERODING BRICK @ PARPET. EXP 3 N.ELEV: CRACK IN 3RD FL SPANDREL & @ PARPET. REMDY:REPAIR &/ORREPLACE
- Failure to
Issued Jan 1, 2012 — FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
1 further open notice is on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 3, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01467183-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01467183-I1
- BBL
- 3022680001
- Postal code
- 11206 · 3093 filings
- Review type
- Professional Certification
- Existing stories
- 4
- Proposed stories
- 4
- Existing dwelling units
- 0
- Proposed dwelling units
- 0