NYC DOB record · B00786798-I1

11 Revere Place

11 Revere Place, Brooklyn, NY 11213

Alteration filing in Crown Heights (North), Brooklyn. The latest DOB status is on hold – administrative action.

The filing is paused until an administrative step is completed. It has not been rejected. What every status means

Under reviewAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Nov 1, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00786798-I1

11 Revere Place

Brooklyn, NY 11213

Alteration filing · status dated Oct 30, 2026

Current record
Under review
Proposed scale
3 stories
Dwelling units
4
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00786798-I1 as a alteration filing at 11 Revere Place, Brooklyn, NY 11213. Its latest published status category is Under review, dated Oct 30, 2026. The filing records 3 proposed stories and 4 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Under review
Latest status date
Oct 30, 2026
Proposed scale
3 proposed stories and 4 proposed dwelling units
Applicant of recordSee the 112 filings that name Twig Consulting Engineers PC
FiledSep 28, 2022
Current recordUnder review
Proposed scale3 stories
Recorded cost$198,100

What the filing says

A public-record reading of the proposed work.

Interior renovation on exisitng 3-story - 4 family residential building . no change in use , means of egress or occupancy in this application .

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 3-story walk-up apartment building built in 1897, with 4 homes, on a 1,674 sq ft lot.

Built
1897
Floors
3
Residential units
4
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R6
Lot area
1,674 sq ft
Building area
2,502 sq ft
Historic district
Crown Heights North III Historic District

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 1, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

No open violations are recorded for this building.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 1, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00786798-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    04
  5. Current status updated

    The latest recorded filing status is “On Hold – Administrative Action.”

    05

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 91,066 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00786798-I1
BIN
3030534
BBL
3012160026
Review type
Professional Certification
Existing stories
3
Proposed stories
3
Existing dwelling units
4
Proposed dwelling units
4
General construction