What the filing says
A public-record reading of the proposed work.
File plumbing work type in conjunction with job#q01049879 to address the violations vio24-01277. no change in use, egress, or occuppancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2-story two-family home built in 1915, on a 2,000 sq ft lot.
- Built
- 1915
- Floors
- 2
- Residential units
- 2
- Building type
- Two-family home
- Land use
- One and two family homes
- Zoning district
- R4-1
- Lot area
- 2,000 sq ft
- Building area
- 1,248 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 5, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 2 notices on file; the most recent was issued Nov 10, 2025.
- Construction
Issued Nov 10, 2025 — BOROUGH COMMISSIONER SWO INTENT TO REVOKE APPLICATION #Q01049879 DUE TO APPLICANT OF RECORD HAS WITHDRAWN FROM THE PROJECT. STOP ALL WORK AND MAKE SITE SAFE.
- Construction
Issued May 6, 2024 — ALL NEW ELECTRICAL WORK FOR WHOLE BUILDINGS, NEW WIRING & MAIN PANEL IN BASEMENT ALONG WITH WIRING TO 2 NEW SPLIT UNIT HVAC ON EXP4. WALKED IN ON WORKER DOING NEW BATHROOM ON 1ST FLOOR BY KITCHEN. NO PERMITS ON FILE FOR ANY OF THE WORK BEING DONE.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 5, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q01049879-S1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 91,085 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q01049879-S1
- BBL
- 4024950047
- Postal code
- 11378 · 153 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 1
- Proposed dwelling units
- 1