NYC DOB record · M00992480-I1

1100 2 Avenue

1100 2 Avenue, Manhattan, NY 10022

Alteration filing in East Midtown-Turtle Bay, Manhattan. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 12, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M00992480-I1

1100 2 Avenue

Manhattan, NY 10022

Alteration filing · status dated Sep 9, 2026

Current record
Recorded as completed
Proposed scale
45 stories
Dwelling units
359
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M00992480-I1 as a alteration filing at 1100 2 Avenue, Manhattan, NY 10022. Its latest published status category is Recorded as completed, dated Sep 9, 2026. The filing records 45 proposed stories and 359 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Sep 9, 2026
Proposed scale
45 proposed stories and 359 proposed dwelling units
Applicant of recordSee the 9 filings that name Mei Architect PLLC
FiledJan 23, 2024
Current recordRecorded as completed
Proposed scale45 stories
Recorded cost$21,000

What the filing says

A public-record reading of the proposed work.

Propose minor partition work as per the plan filed herewith. no change in use, occupancy, or egress.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 45-story elevator apartment building built in 1968, with 371 homes, on a 34,926 sq ft lot.

Built
1968
Floors
45
Residential units
371
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
C1-9
Lot area
34,926 sq ft
Building area
539,027 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 12, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 11 open notices on record for this building, out of 127 notices on file; the most recent was issued Feb 22, 2023.

  • No report and / or late filing (facade)

    Issued Feb 22, 2023 — FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023

  • Failure to

    Issued Feb 2, 2022 — FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4

  • Plumbing

    Issued Nov 22, 2021 — THE BOROUGH COMMISSIONER INTENDS TO REVOKE ALL PLUMBING APPROVALS AND PERMIT ISSUED UNDER JOB NUMBER 140506361 DUE TO IN ACTIVE OF LICENSE MASTER PLUMBER # 1632 STOP ALL PLUMBING WORK UNDER ABOVE MENTIONED PERMIT IMMEDIATELY

  • 8 further open notices are on file. Open the source dataset for the full list.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M00992480-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M00992480-I1
BIN
1039997
BBL
1013500001
Review type
Standard Plan Examination
Existing stories
45
Proposed stories
45
Existing dwelling units
359
Proposed dwelling units
359
General construction