NYC DOB record · M01413799-I1

1105 Park Avenue

1105 Park Avenue, Manhattan, NY 10128

Alteration filing in Upper East Side-Carnegie Hill, Manhattan. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 7, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01413799-I1

1105 Park Avenue

Manhattan, NY 10128

Alteration filing · status dated Oct 5, 2026

Current record
Recorded as completed
Proposed scale
7 stories
Dwelling units
19
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01413799-I1 as a alteration filing at 1105 Park Avenue, Manhattan, NY 10128. Its latest published status category is Recorded as completed, dated Oct 5, 2026. The filing records 7 proposed stories and 19 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Oct 5, 2026
Proposed scale
7 proposed stories and 19 proposed dwelling units
Applicant of recordSee the 4 filings that name Seth P. Roye Architect PC
FiledJun 22, 2026
Current recordRecorded as completed
Proposed scale7 stories
Recorded cost$33,000

What the filing says

A public-record reading of the proposed work.

Apartment renovation work to apartment 1d as per plans. no change to egress, use or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 14-story elevator apartment building built in 1923, with 57 homes, on a 13,427 sq ft lot.

Built
1923
Floors
14
Residential units
57
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R10
Lot area
13,427 sq ft
Building area
147,065 sq ft
Historic district
Park Avenue Historic District

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 7, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 8 open notices on record for this building, out of 85 notices on file; the most recent was issued Sep 6, 2019.

  • (other bldgs types) - elevator affirmation of

    Issued Sep 6, 2019 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST

  • (other bldgs types) - elevator affirmation of

    Issued Sep 6, 2019 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST

  • (other bldgs types) - elevator affirmation of

    Issued Jan 26, 2018 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST

  • 5 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 7, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01413799-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01413799-I1
BIN
1048105
BBL
1015180001
Review type
Professional Certification
Existing stories
7
Proposed stories
7
Existing dwelling units
19
Proposed dwelling units
19
General construction