What the filing says
A public-record reading of the proposed work.
Proposed installation of heavy duty sidewalk shed for new building as per plans. no change in use occupancy or egress under this application. live load 300 per square feet. sidewalk shed shall comply with chapter # 33 of the 2014 code
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a utility property on a 25,749 sq ft lot.
- Residential units
- 0
- Building type
- Utility property
- Land use
- Transportation and utility
- Zoning district
- M1-4A/R9A
- Lot area
- 25,749 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 2 notices on file; the most recent was issued Jun 4, 2025.
- Construction
Issued Jun 4, 2025 — EMERGENCY WORK ORDER:EXPS 2&3 (EAST & SOUTH ELEV.) MULTIPLE BROKEN/ CRACKED WINDOWS,SPALLING BRICKS, DETERIORATED MORTAR JOINTS & CRACKS @ MULT LOCS @ EXP 2 (E ELE) DAMAGE WINDOW LINTELS WERE OBSERVED. REMEDY: IMMEDIATELY PROVIDE SAFETY MEASURES TO SECURE PUBLIC SAFETY. REPAIR & REMOVE ANY BROKEN GLASS.IMMEDIATELY PROV SIDEWALK SHED U/LP EXP2 & 3
- Construction
Issued Jun 4, 2025 — FAILURE TO MAINTAIN BUILDING EXTERIOR FACADE IN A CODE COMPLIANT MANNER: AT TIME OF I NSPECTION IT WAS OBSERVED AT ALL EXPOSURES, BROKEN/CRACKED WINDOWS, DAMAGED LINTELS, CRACKS ON BRICK, DETERIORATED MORTAR JOINTS & SPALLING BRICK. REMEDY: REPAIR AND/OR REPLACE
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00044826-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00044826-I1
- BIN
- 3332194
- BBL
- 3011260032
- Postal code
- 11238 · 2035 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- Empty in the source








