NYC DOB record · B00044826-I1

1114 Atlantic Avenue

1114 Atlantic Avenue, Brooklyn, NY 11238

Alteration filing in Crown Heights (North), Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 11, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00044826-I1

1114 Atlantic Avenue

Brooklyn, NY 11238

Alteration filing · status dated Dec 6, 2023

Current record
Approved
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00044826-I1 as a alteration filing at 1114 Atlantic Avenue, Brooklyn, NY 11238. Its latest published status category is Approved, dated Dec 6, 2023. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Dec 6, 2023
Proposed scale
Not stated in this filing
Applicant of recordSee the 1041 filings that name Ashraf Corp
FiledMay 21, 2018
Current recordApproved
Proposed scaleNot specified
Recorded cost$5,000

What the filing says

A public-record reading of the proposed work.

Proposed installation of heavy duty sidewalk shed for new building as per plans. no change in use occupancy or egress under this application. live load 300 per square feet. sidewalk shed shall comply with chapter # 33 of the 2014 code

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a utility property on a 25,749 sq ft lot.

Residential units
0
Building type
Utility property
Land use
Transportation and utility
Zoning district
M1-4A/R9A
Lot area
25,749 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 2 open notices on record for this building, out of 2 notices on file; the most recent was issued Jun 4, 2025.

  • Construction

    Issued Jun 4, 2025 — EMERGENCY WORK ORDER:EXPS 2&3 (EAST & SOUTH ELEV.) MULTIPLE BROKEN/ CRACKED WINDOWS,SPALLING BRICKS, DETERIORATED MORTAR JOINTS & CRACKS @ MULT LOCS @ EXP 2 (E ELE) DAMAGE WINDOW LINTELS WERE OBSERVED. REMEDY: IMMEDIATELY PROVIDE SAFETY MEASURES TO SECURE PUBLIC SAFETY. REPAIR & REMOVE ANY BROKEN GLASS.IMMEDIATELY PROV SIDEWALK SHED U/LP EXP2 & 3

  • Construction

    Issued Jun 4, 2025 — FAILURE TO MAINTAIN BUILDING EXTERIOR FACADE IN A CODE COMPLIANT MANNER: AT TIME OF I NSPECTION IT WAS OBSERVED AT ALL EXPOSURES, BROKEN/CRACKED WINDOWS, DAMAGED LINTELS, CRACKS ON BRICK, DETERIORATED MORTAR JOINTS & SPALLING BRICK. REMEDY: REPAIR AND/OR REPLACE

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00044826-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “Permit Entire.”

    03

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00044826-I1
BIN
3332194
BBL
3011260032
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
Empty in the source
Proposed dwelling units
Empty in the source