What the filing says
A public-record reading of the proposed work.
Installation of 300psf & 600psf sidewalk shed as per plans. storage of material is allowed where indicated on plans. shed shall comply with chapter #33 of the NYC building code 2022. no change in use, occupancy, or egress under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 26-story condominium built in 1927, with 146 homes, on a 10,237 sq ft lot.
- Built
- 1927
- Last altered
- 1997
- Floors
- 26
- Residential units
- 146
- Building type
- Condominium
- Land use
- Mixed residential and commercial
- Zoning district
- C5-5
- Lot area
- 10,237 sq ft
- Building area
- 149,564 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 1, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 19 open notices on record for this building, out of 67 notices on file; the most recent was issued Aug 12, 2024.
- Construction
Issued Aug 12, 2024 — PREMISE NON-COMPLIANT : DUE TO A VEHICLE STRIKING THE EXPOSURE 1 SECTION OF SIDEWALK SHED DISLODGING 4 VERTICAL MEMBERS WITH THE BRACING TWISTED, WITH 3 HORIZONTAL MEMBERS MOVED AT TIME OF INSPECTION RENDERING THE PREMISE NON-COMPLIANT
- Failure to submit
Issued Jun 23, 2024 — FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023)
- Hazardous condition (facade)
Issued May 16, 2023 — CYCLE 9B UNSAFE REPORT FILED
16 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M00841963-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 70,325 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M00841963-I1
- BIN
- 1001115
- BBL
- 1000687501
- Postal code
- 10038 · 194 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 148
- Proposed dwelling units
- 148