What the filing says
A public-record reading of the proposed work.
Temporary pipe scaffold as per drawings. scaffold shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 12-story office building built in 1911, on a 8,465 sq ft lot.
- Built
- 1911
- Last altered
- 1988
- Floors
- 12
- Residential units
- 0
- Building type
- Office building
- Land use
- Commercial and office
- Zoning district
- M1-8A/R11
- Lot area
- 8,465 sq ft
- Building area
- 97,005 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 3, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 6 open notices on record for this building, out of 64 notices on file; the most recent was issued Aug 1, 2024.
- Failure to correct swarmp conditions (facade)
Issued Aug 1, 2024 — FAILURE TO CORRECT SWARMP CONDITIONS
- Hazardous condition (facade)
Issued Jun 3, 2024 — CYCLE 9C UNSAFE REPORT FILED
- No report and / or late filing (facade)
Issued Feb 22, 2024 — FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
3 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 23, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01468411-I1.
- Current status updated02
The latest recorded filing status is “Pending Prof Cert QA Assignment.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01468411-I1
- BBL
- 1008010051
- Postal code
- 10001 · 562 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0