NYC DOB record · M01394419-I1

116 Edgecombe Avenue

116 Edgecombe Avenue, Manhattan, NY 10030

Alteration filing in Harlem (North), Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 27, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01394419-I1

116 Edgecombe Avenue

Manhattan, NY 10030

Alteration filing · status dated Oct 23, 2026

Current record
Approved
Proposed scale
1 stories
Dwelling units
1
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01394419-I1 as a alteration filing at 116 Edgecombe Avenue, Manhattan, NY 10030. Its latest published status category is Approved, dated Oct 23, 2026. The filing records 1 proposed story and 1 proposed dwelling unit.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 23, 2026
Proposed scale
1 proposed story and 1 proposed dwelling unit
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 1060723Applicant of recordSee the 346 filings that name Ikra Consulting LLC
FiledMay 4, 2026
Current recordApproved
Proposed scale1 stories
Recorded cost$9,000

What the filing says

A public-record reading of the proposed work.

Installation of 300psf sidewalk shed as per plans. all equipment shall comply with ch #33 of the NYC code 2022. no change in use, occupancy or egress under this application.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 1-story place of worship built in 1926, on a 5,610 sq ft lot.

Built
1926
Last altered
1980
Floors
1
Residential units
0
Building type
Place of worship
Land use
Public facilities and institutions
Zoning district
R7-2
Lot area
5,610 sq ft
Building area
5,015 sq ft
Historic district
Dorrance Brooks Square Historic District

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 27, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 11 open notices on record for this building, out of 21 notices on file; the most recent was issued Nov 14, 2025.

  • Low pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Sep 23, 2024 — VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION

  • Construction

    Issued Jan 26, 2024 — STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION DAMAGE OBSERVED TO HAVE BEEN SUSTAINED IN 3RD FLOOR GALLEY /STORAGE AREA DUE TO FIRE AT 116 EDGECOMBE AVE MANHATTAN

  • 8 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 26, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01394419-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 87,269 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01394419-I1
BBL
1020420027
Review type
Professional Certification
Existing stories
1
Proposed stories
1
Existing dwelling units
1
Proposed dwelling units
1
Sidewalk shed