What the filing says
A public-record reading of the proposed work.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the NYC building code. no change in use, occupancy, or egress under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 18-story hotel built in 2003, on a 4,379 sq ft lot.
- Built
- 2003
- Floors
- 18
- Residential units
- 0
- Building type
- Hotel
- Land use
- Commercial and office
- Zoning district
- M1-9A/R12
- Lot area
- 4,379 sq ft
- Building area
- 49,286 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 11, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 24 notices on file; the most recent was issued Oct 23, 2025.
- Construction
Issued Oct 23, 2025 — EWO TO SEVERE DETERORATED WATER TOWER ROOF WITH LOOSE/MISSING WOOD # REMEDY: IMMEDLY PROVIDE ADEQUATE SAFETY MEASURES TO SECURE/PROTECTTHE PUBLIC/PROPERTY. IMMEDLY REMOVE ALL LOOSE MATERIAL AND STABILIZE THE WATER TOWER ROOF. ALL REMEDIAL WORK MUST BE COMPLETE UNDER F/T SUPERV OF AN RDP. PROVIDE DAILY PHOTOS & SUMMARY TO FACADE@BUILDINGS.NYC.GOV
- No report and / or late filing (facade)
Issued Feb 22, 2022 — FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
- No report and / or late filing (facade)
Issued May 31, 2018 — FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 11, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01385586-S1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 79,348 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01385586-S1
- BIN
- 1087523
- BBL
- 1008060052
- Postal code
- 10001 · 676 filings
- Review type
- Professional Certification
- Existing stories
- 18
- Proposed stories
- 18
- Existing dwelling units
- 0
- Proposed dwelling units
- 0








