What the filing says
A public-record reading of the proposed work.
Installation of outrigger and material hoist for the facade repair work as per plan submitted.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story elevator apartment building built in 1938, with 77 homes, on a 18,578 sq ft lot.
- Built
- 1938
- Floors
- 6
- Residential units
- 77
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R8
- Lot area
- 18,578 sq ft
- Building area
- 86,500 sq ft
- Historic district
- Grand Concourse Historic District
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 2, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 59 notices on file; the most recent was issued Jun 16, 2026.
- Construction
Issued Jun 16, 2026 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED THE FOLLOWING CONDITIONS. BROKEN WINDOW PANE @ EXPOSURE 1 6FL SOUTH CORNER TO ENTRANCE COURTYARD. BROKEN PANE EXPOSURE 2 GROUND FL GARBAGE AREA REMEDY: REPAIR AND/OR REPLACE
- Construction
Issued Oct 8, 2024 — FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER: AT EXPOSURE 1 (W ELEV) STEP CRACKS ON DETERIORATED MORTAR JOINTS, CRACKS AROUND WINDOW CORNERS,SPALLED BRICKS & LOOSE BRICK. AT EXP3 (EAST ELE) CRACKS & LOOSE BRICKS @ WINDOW CORNERS AND CRACKS ON FACADE @ EXP 4(S.ELEV) IMPROPERLY SUPPORTED AC UNIT. REMEDY: REPAIR AND/OR REPLACE
- Construction
Issued Jun 12, 2024 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.NOTE OBSERVED AT EXP1 WEST ELEV,DAMAGED MASONRY AROUND WINDOW CORNER,DAMAGED/LOOSE M ORTAR JOINTS,VERTICAL CRACKS,INADEQUATE REPAIRS AND DAMAGED WINDOW LIN TELS ON VARIOUS FLOORS.ALSO OBSERVED STEP CRACKS AT INTERIOR PARAPET W ALLS ON ROOF FACING EXP2 AND 3.REMEDY:FIX AND/OR REPLACE
1 further open notice is on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 2, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01057000-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01057000-I1
- BBL
- 2024560150
- Postal code
- 10456 · 217 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- Empty in the source








