What the filing says
A public-record reading of the proposed work.
Full demolition of five story structure, using hand held equipment to demolish.
Street Futures classifies this record as a full demolition based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5-story walk-up apartment building built in 1915, with 7 homes, on a 5,833 sq ft lot.
- Built
- 1915
- Last altered
- 1986
- Floors
- 5
- Residential units
- 7
- Building type
- Walk-up apartment building
- Land use
- Mixed residential and commercial
- Zoning district
- C6-2A
- Lot area
- 5,833 sq ft
- Building area
- 27,853 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 1, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 17 open notices on record for this building, out of 52 notices on file; the most recent was issued Mar 12, 2021.
- Elevator
Issued Mar 12, 2021
- Elevator
Issued Mar 12, 2020
- (other bldgs types) - elevator affirmation of
Issued Sep 6, 2019 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
14 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M00897296-I1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 75,295 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M00897296-I1
- BIN
- 1001643
- BBL
- 1001500017
- Postal code
- 10007 · 169 filings
- Review type
- Standard Plan Examination
- Existing stories
- 5
- Proposed stories
- Empty in the source
- Existing dwelling units
- 7
- Proposed dwelling units
- Empty in the source