What the filing says
A public-record reading of the proposed work.
2026 US Open Hospitality - Erect pre-engineered free standing wall panel system located within the Indoor Tennis Center Building during the US Open August 16, 2026 thru September 20, 2026.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a outdoor recreation facility built in 1939, on a 17,870,000 sq ft lot.
- Built
- 1939
- Last altered
- 2025
- Residential units
- 0
- Building type
- Outdoor recreation facility
- Land use
- Open space and outdoor recreation
- Zoning district
- PARK
- Lot area
- 17,870,000 sq ft
- Building area
- 1,407,850 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 5, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 11 notices on file; the most recent was issued Apr 23, 2020.
- Plumbing
Issued Apr 23, 2020 — DOB VIOLATION ISSUED FOR EXCEEDING SCOPE OF LAA# Q00341739- PW1 IS REQUIRED
- Low pressure boiler
Issued Mar 3, 2015 — VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
- Low pressure boiler
Issued Mar 3, 2015 — VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 23, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q01442259-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 91,085 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q01442259-I1
- BBL
- 4020180001
- Postal code
- 11368 · 437 filings
- Review type
- Professional Certification
- Existing stories
- 3
- Proposed stories
- 3
- Existing dwelling units
- 0
- Proposed dwelling units
- 0