What the filing says
A public-record reading of the proposed work.
Install temporary Amex Experience display located on Floor 001 of the Indoor Tennis Center for use during the 2026 US Open Tennis Tournament from August 16, 2026 thru September 20, 2026.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a outdoor recreation facility built in 1939, on a 17,870,000 sq ft lot.
- Built
- 1939
- Last altered
- 2025
- Residential units
- 0
- Building type
- Outdoor recreation facility
- Land use
- Open space and outdoor recreation
- Zoning district
- PARK
- Lot area
- 17,870,000 sq ft
- Building area
- 1,407,850 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 7, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 11 notices on file; the most recent was issued Apr 23, 2020.
- Plumbing
Issued Apr 23, 2020 — DOB VIOLATION ISSUED FOR EXCEEDING SCOPE OF LAA# Q00341739- PW1 IS REQUIRED
- Low pressure boiler
Issued Mar 3, 2015 — VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
- Low pressure boiler
Issued Mar 3, 2015 — VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q01450405-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q01450405-I1
- BIN
- 4539544
- BBL
- 4020180001
- Postal code
- 11368 · 229 filings
- Review type
- Professional Certification
- Existing stories
- 3
- Proposed stories
- 3
- Existing dwelling units
- 0
- Proposed dwelling units
- 0