NYC DOB record · X01023907-S3

1240 River Avenue

1240 River Avenue, Bronx, NY 10452

New building filing in Concourse-Concourse Village, Bronx. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedNew building

NYC Department of Buildings · w9ak-ipjd · accessed Sep 2, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · X01023907-S3

1240 River Avenue

Bronx, NY 10452

New building · status dated Aug 31, 2026

Current record
Approved
Proposed scale
17 stories
Dwelling units
328
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing X01023907-S3 as a new building at 1240 River Avenue, Bronx, NY 10452. Its latest published status category is Approved, dated Aug 31, 2026. The filing records 17 proposed stories and 328 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Approved
Latest status date
Aug 31, 2026
Proposed scale
17 proposed stories and 328 proposed dwelling units
The building, not the filingopen housing violations, the owner of record and every filing at BIN 2131032Applicant of recordSee the 18 filings that name Geodesign INC. PC
FiledJul 12, 2024
Current recordApproved
Proposed scale17 stories
Recorded costNot published

What the filing says

A public-record reading of the proposed work.

Support of excavation by rock stabilization in conjunction with construction of 17-sotry new building

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Violation record

Are there open violations here?

No open violations are recorded for this building.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 19, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing X01023907-S3.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
X01023907-S3
BBL
Empty in the source
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
17
Existing dwelling units
Empty in the source
Proposed dwelling units
328