NYC DOB record · Q01348476-I1

130-27 147 Street

130-27 147 Street, Queens, NY 11436

Alteration filing in Baisley Park, Queens. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 23, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · Q01348476-I1

130-27 147 Street

Queens, NY 11436

Alteration filing · status dated Sep 21, 2026

Current record
Approved
Proposed scale
2 stories
Dwelling units
2
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing Q01348476-I1 as a alteration filing at 130-27 147 Street, Queens, NY 11436. Its latest published status category is Approved, dated Sep 21, 2026. The filing records 2 proposed stories and 2 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 21, 2026
Proposed scale
2 proposed stories and 2 proposed dwelling units
Applicant of recordSee the 1 filings that name Sira Engineering, PLLC
FiledJan 19, 2026
Current recordApproved
Proposed scale2 stories
Recorded cost$5,600

What the filing says

A public-record reading of the proposed work.

Demolition of Partially Constructed Non-Permitted Structure in the Rear Year to resolve NYC Violations No. V-111425C25-02651; V-111725CCE41201AD ;V-112025CCE41201AD, And ECB/OATH Violation Number 39167103K, and 39167155M

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 2-story two-family home built in 1940, on a 3,528 sq ft lot.

Built
1940
Last altered
2001
Floors
2
Residential units
2
Building type
Two-family home
Land use
One and two family homes
Zoning district
R3A
Lot area
3,528 sq ft
Building area
1,800 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 23, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 5 open notices on record for this building, out of 5 notices on file; the most recent was issued Jul 2, 2026.

  • Construction

    Issued Jul 2, 2026 — STRUCTURE RENDERED NON COMPLIANT DUE TO FIRE. AT CELLAR LEVEL THE BOILER ROOM SUFFERED SIGNIFICANT FIRE AND WATER DAMAGE WITH CHARRED BEAMS AND FLOOR JOISTS. WINDOWS WERE ALSO BROKEN AND/OR REMOVED FOR VENTING PURPOSES.

  • Immediate

    Issued Jul 2, 2026 — ..REMEDY; SEAL FIRE DAMAGED BUILDING

  • Construction

    Issued Nov 20, 2025 — OBSERVED UNPERMITTED WOOD FRAMING AT REAR YARD, HAZARD TO LIFE AND PROPERTY. REMEDY: RETAIN NYS PE FOR TEMPORARY STABILITY/SHORING OF UNPERMITTED WOOD FRAME STRUCTURE AT REAR. START WORK NO LATER THAN 11/24/25

  • 2 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 23, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing Q01348476-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
Q01348476-I1
BIN
4262907
BBL
4121100020
Review type
Standard Plan Examination
Existing stories
2
Proposed stories
2
Existing dwelling units
2
Proposed dwelling units
2
General construction