What the filing says
A public-record reading of the proposed work.
Installation of heavy-duty sidewalk shed as per plans. no change in use occupancy or egress under this application. sidewalk shed shall comply with chapter 33 of the 2022 NYC building code.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story walk-up apartment building built in 1924, with 63 homes, on a 17,050 sq ft lot.
- Built
- 1924
- Last altered
- 1986
- Floors
- 6
- Residential units
- 63
- Building type
- Walk-up apartment building
- Land use
- Walk-up apartments
- Zoning district
- R7-2
- Lot area
- 17,050 sq ft
- Building area
- 54,370 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 23, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 8 notices on file; the most recent was issued Aug 27, 2025.
- Immediate
Issued Aug 27, 2025 — PROVIDE APPROXIMATELY 55 LINEAR FEET OF SIDEWALK SHED,14 FEET IN WIDTH TO SPAN THE FIRE PASSAGEWAY FROM 1326 RIVERSIDE DRIVE TO 1322 RIVERSIDE DRIVE, ENSURING COVERAGE OF THE HAZARDOUS EXPOSURE AREA
- Construction
Issued Aug 27, 2025 — REQUESTING AN ENGINEER REPORT DUE PARAPET WALL BEING IN A STATE OF DISREPAIR. AN ENGINEERING REPORT IS REQUIRED TO ASSESS AND RECTIFY THE DAMAGES PROPERTY HAS SUSTAINED.
- Failure to post energy
Issued Dec 1, 2021 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 23, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01279687-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01279687-I1
- BIN
- 1064326
- BBL
- 1021770228
- Postal code
- 10033 · 122 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 63
- Proposed dwelling units
- 63








