NYC DOB record · Q01216979-I1

133-25 37 Avenue

133-25 37 Avenue, Queens, NY 11354

Alteration filing in Flushing-Willets Point, Queens. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 24, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · Q01216979-I1

133-25 37 Avenue

Queens, NY 11354

Alteration filing · status dated Oct 22, 2026

Current record
Approved
Proposed scale
16 stories
Dwelling units
352
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing Q01216979-I1 as a alteration filing at 133-25 37 Avenue, Queens, NY 11354. Its latest published status category is Approved, dated Oct 22, 2026. The filing records 16 proposed stories and 352 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 22, 2026
Proposed scale
16 proposed stories and 352 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 4112220Applicant of recordSee the 128 filings that name Fang Architect
FiledApr 30, 2025
Current recordApproved
Proposed scale16 stories
Recorded cost$150,500

What the filing says

A public-record reading of the proposed work.

Filed for a temporary use permit for (4) model apartments (8a, 8c, 8f, 8k) @ 8th floor pursuant to section ac 28-111 and buildings bulletin 2010-002.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 16-story hotel built in 2024, with 150 homes, on a 43,000 sq ft lot.

Built
2024
Last altered
2021
Floors
16
Residential units
150
Building type
Hotel
Land use
Commercial and office
Lot area
43,000 sq ft
Building area
254,196 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 24, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

No open violations are recorded for this building. 21 notices are on file, all with a recorded resolution.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 24, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing Q01216979-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 86,497 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
Q01216979-I1
BBL
4049700011
Review type
Standard Plan Examination
Existing stories
16
Proposed stories
16
Existing dwelling units
352
Proposed dwelling units
352
General construction