NYC DOB record · B00541926-I1

1337 Sterling Place

1337 Sterling Place, Brooklyn, NY 11213

Alteration filing in Crown Heights (North), Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00541926-I1

1337 Sterling Place

Brooklyn, NY 11213

Alteration filing · status dated Jun 17, 2021

Current record
Approved
Proposed scale
Not stated
Dwelling units
8
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00541926-I1 as a alteration filing at 1337 Sterling Place, Brooklyn, NY 11213. Its latest published status category is Approved, dated Jun 17, 2021. The filing records 8 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Jun 17, 2021
Proposed scale
8 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 3036454Applicant of recordSee the 1374 filings that name Syed Engineering, P.C.
FiledJun 17, 2021
Current recordApproved
Proposed scale8 units
Recorded cost$9,000

What the filing says

A public-record reading of the proposed work.

Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the NYC building code. no change in use, occupancy, or egress under this application.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 4-story walk-up apartment building built in 1899, with 8 homes, on a 3,720 sq ft lot.

Built
1899
Last altered
2021
Floors
4
Residential units
8
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R6
Lot area
3,720 sq ft
Building area
8,595 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 16, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 4 open notices on record for this building, out of 10 notices on file; the most recent was issued Jun 23, 2022.

  • Construction

    Issued Jun 23, 2022 — THE BOROUGH COMMISSION HAS ORDERED ALL WORK STOP UNDER APPLICATION 321931825 IMMEDIATELY DUE TO THE CONSTRUCTION SUPERINTENDENT OF RECORD HAS IN WITHDRAWN FROM THE PROJECT. THEREFORE, UNTIL A NEW CONSTRUCTION SUPERINTENDENT IS IN PLACE AS REQUIRED BY ARTICLE 116 OF CHAPTER 1 OF TITLE 28 AC, YOU ARE ORDER TO STOP ALL WORK IMMEDIAETELY.

  • Construction

    Issued Jun 23, 2022 — THE BOROUGH COMMISSION HAS ORDERED ALL WORK STOP UNDER APPLICATION # 321931825 IMMEDIATELY DUE TO THE APPLICANT OF RECORD HAS WITHDRAWN FROM THE PROJECT THEREFORE, UNTIL A NEW PERMIT HOLDER IS IN PLACE AS REQUIRED BY ARTICLE 116 OF CHAPTER 1 OF TITLE 28 AC, YOU ARE ORDER TO STOP ALL WORK IMMEDIAETELY AND MAKE SITE SAFE.

  • Construction

    Issued Jun 23, 2022 — THE BOROUGH COMMISSION HAS ORDERED ALL WORK STOP UNDER APPLICATION # 321931825 IMMEDIATELY DUE TO THE APPLICANT OF RECORD HAS WITHDRAWN FROM THE PROJECT THEREFORE, UNTIL A NEW PERMIT HOLDER IS IN PLACE AS REQUIRED BY ARTICLE 116 OF CHAPTER 1 OF TITLE 28 AC, YOU ARE ORDER TO STOP ALL WORK IMMEDIAETELY AND MAKE SITE SAFE.

  • 1 further open notice is on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 15, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00541926-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “Permit Entire.”

    03

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00541926-I1
BBL
3013710056
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
8
Proposed dwelling units
8
Scaffolding